Loading...
Freeport NIP(7.2)-LR000810 (2) GEOTECHNICAL AND ~ F=I r-~ U F~ ENVIRONMENTAL CONSULTANTS REPORT OF PIER OBSERVATION Freeport V Royal Lane and Creekview Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 38 5495 Beltline Road, Suite 360 REPORT DATE: 08-10-00 Dallas, Texas 75240 REG PROJECT NO. 6591 ATTN: Mr. Paul Brown TECHNICIAN: G. Oritz & LT Edwards PAGE: 1 of 2 CONTRACTOR: Hill & Wilkinson, Inc. I PierDiameterlBellDiameterj Depth Before I Final Depth of Date Pier No. (inches) (inches) Bell (feet) Pier (feet) 08-03-00 A-12.9 18 54 9.1 9.4 A-12.4 18 54 9.0 9.6 A-11.9 18 48 9.0 9.0 A-11.6 18 42 10.0 10.1 A-11.3 18 48 9.6 9.7 A-10.9 18 54 9.6 9.6 A-10.2 18 54 9.4 9.6 A-9.8 18 48 9.7 9.8 A-9.5 18 42 10.0 10.0 A-9.2 18 48 9.0 9.0 A-8.8 18 54 9.2 9.5 A-13.3 18 42 8.2 8.2 A-13.6 18 42 7.0 7.0 A-14 18 54 7.4 7.4 A-14.3 18 42 7.2 7.2 A-14.6 18 42 7.3 7.3 A-15.1 18 54 7.5 7.5 A-15.8 18 54 8.6 8.6 A-16.1 18 48 9.0 9.0 A-16.4 18 42 10.0 10.0 A-16.8 18 48 9.3 9.4 A-17.1 18 54 10.8 11.0 A-17.8 18 54 11.8 11.8 A-18.2 18 48 11.8 11.8 A-18.5 18 42 11.9 12.0 A-18.9 18 48 14.0 14.0 A-19.3 18 48 14.1 14.2 A-7.6 18 42 15.1 15.1 A-7.3 18 42 14.9 15.2 08-04-00 A-7.6 18 42 8.1 8.1 A-8.1 18 54 8.1 8.1 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 REPORT NO. 38 REPORT DATE: 08-10-00 REG PROJECT NO. 6591 PAGE: 2 of 2 I [ Pier Diameter [ Bell DiameterI Depth Before I Final Depth of Date Pier No. (inches) (inches) Bell (feet) Pier (feet) 08-04-00 A-1 18 48 8.0 8.0 A-2.4 18 42 8.3 9.1 A-2.1 18 48 9.5 9.5 A-1.7 18 48 8.9 8.9 A-1.3 18 42 8.0 8.0 A.6-1 18 54 8.0 8.0 B.2-1 18 54 8.2 8.3 B.9-1 18 54 8.0 8.6 C.5-1 18 54 8.0 8.3 I Pier Depth Before Date Pier No. Diameter (inches) Bell (feet) 08-03-00 A-3.1 * 18 15.0 A-3.9' 18 15.0 A-4.2' 18 15.0 A-4.6' 18 15.0 A-4.9' 18 15.0 A-5.3' 18 15.0 A-5.9' 18 15.0 A-6.3' 18 15.0 A-6.6' 18 15.0 A-7* 18 15.0 · Piers previously drilled. Redrilled holes to 15', pumped out water and poured concrete up to eight feet below grade. These piers to be belled at a later date. Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Paul Brown Submitted by: (1) Hardy McCullah/MLM Architects/ Mr. Norman Coates REED ENGINEERING GROUP, INC. (1) TMBP - Consulting Engineers/ Mr. Frank Merritt Original Signed By (1) Pacheco Koch/Mr. Jim Koch (1) Hill & Wilkinson, Inc./ James F. Phipps, P.E. Mr. Steve Camp BR/je (1) City of Coppell/Mr. Lee Stone or Mr. Larry Davis