Loading...
Freeport NIP(2.5)-LR 980312 (3) R EE:[:I I Er-lEi I I=IE E RII=II:~ GEOTECHNICAL AND [~ F~ I"'1 ENVIP, ONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Northpoint Distribution Center Royal Lane at Northpoint Drive Coppell, Texas REPORTED TO: Myers & Crow Company, Ltd. REPORT NO. 13 3811 Turtle Creek Boulevard REPORT DATE: 03-12-98 Suite 730 REG PROJECT NO. 4115 Dallas, Texas 75219 TECHNICIAN: F. Steadman ATTN: Mr. Richard Crow PAGE: 1 of 1 CONTRACTOR:. McFadden & Miller On the referenced dates a representative of Reed Engineering Group, Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. 8 5 100-200 12-18 3 4 10 5 1 02-17-98 22,500 100 1 2 02-18-98 37,800 100 1 Surfactant added at regular intervals: Yes Comments: 2) Moisture test east 600'x250' Distribution: (4) Myers & Crow Company, Ltd./ Submitted by: Mr. Richard Crow (1) AECC, Inc./Mr. Andy Brundige REED ENGINEERING GROUP, INC. (1) Dockery Engineering/ Mr. Bill Wray Original Signed By (1) McFadden & Miller/ Mr. Jon Jacobson Ronald F. Reed, P.E. (1) Halff Associates/Mr. Pat Acker KENrls (1) Pritchard Associates/ Mr. Jim Pritchard (1) O'Brien & Associates/ Mr. Mick Granlund 2424 STUTZ DP,.. SUITE 400- DALLA$, TX 75235 · TEL[214] 350 5600 · FAX[214] 350 0019