Loading...
Freeport NIP(2.5)-LR 980313 (2) GEOTECHNICAL AND [~ R I'-'1 LJ ~=~ I:NVIR. ONFIENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Northpoint Distribution Center Royal Lane at Northpoint Drive Coppell, Texas REPORTED TO: Myers & Crow Company, Ltd. REPORT NO. 17 3811 Turtle Creek Boulevard REPORT DATE: 03-13-98 Suite 730 REG PROJECT NO. 4115 Dallas, Texas 75219 TECHNICIAN: F. Steadman ATTN: Mr. Richard Crow PAGE: 1 of 1 CONTRACTOR:. McFadden & Miller On the referenced dates a representative of the Reed Engineering Group, Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. 8 5 100-200 16 I 3 4 10 5 02-24-98 39,500 100 2 02-25-98 42,000 100 2 02-26-98 36,000 100 2 02-27-98 40,000 100 3 Surfactant added at regular intervals: Yes Distribution: (4) Myers & Crow Company, Ltd./ Submitted by: Mr. Richard Crow (1) AECC, Inc./Mr. Andy Brundige REED ENGINEERING GROUP, INC. (1) Dockery Engineering/ Mr. Bill Wray File Copy (1) McFadden & Miller/ Mr. Jon Jacobson Ronald F. Reed, P.E. (1) Halff Associates/Mr. Pat Acker KEA/rls (1) Pritchard Associates/ Mr. Jim Pritchard (1) O'Brien & Associates/ Mr. Mick Granlund 2424 STUTZ DP,. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019