Loading...
Freeport NIP(7.2)-LR000609 GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS POST INJECTION CONFIRMATION RESULTS Freeport V Royal Lane and Creekview Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 16 5495 Beltline Road, Suite 360 REPORT DATE: 06-09-00 Dallas, Texas 75240 REG PROJECT NO. 6591 A'I-I'N: Mr. Paul Brown PAGE: I of 1 AREA REPRESENTED: Building Pad Boring Number/Pocket Pen Date Sampled I Depth 05-25-00 0.0- 1.5 3.10 4.30 1.50 0.75 2.75 2.25 2.80 1.5- 3.0 2.70 2.30 1.90 2.50 2.75 2.25 2.40 3.0- 4.5 2.20 3.10 2.50 2.60 3.10 4.00 1.80 4.5- 6.0 4.5+ 3.30 4.5+ 3.00 3.30 3.25 2.80 6.0- 7.5 3.70 3.60 4.25 3.25 3.25 3.60 2.60 7.5- 9.0 4.00 3.40 3.60 3.75 2.25 3.00 2.60 9.0- 10.0 3.70 3.60 3.80 3.50 3.25 3.75 3.10 Comments: Borings obtained after two to four injection passes. Based on these results, an additional pass was not considered necessary for the southern portion of the pad. ^ third pass is considered necessary for the northern portion. Confirmation borings should be drilled at the completion of the third pass. Distribution: (1) Duke-Weeks Realty Corporation/ Submitted by: Mr. Paul Brown (1) Hardy McCullah/MLM Architects/ REED ENGINEERING GROUP, INC. Mr. Norman Coates (1) TMBP - Consulting Engineers/ Original Signed By Mr. Frank Merritt (1) Pacheco Koch/Mr. Jim Koch James F. Phipps, P.E. (1) Hill & Wilkinson, Inc./Mr. Steve Camp BW/cg (1) City of Coppell/Mr. Lee Stone or Mr. Larry Davis 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019