Freeport NIP(7.2)-CS001116 *.' ~/ MEMORANDUM
, FROM THE
DEPARTMENT OF PUBLIC WORKS
To: Larry Davis, Construction InspectoF F~p3,,eering
From: Danny Hightower, Utilities Division Public Works
Date: 11/1~/00
RE: Walk-Thru at Freeport V Lot 1 Block A
1. Mark on curb in red M.H. for maahole on Royal La.
2. Need a ieUer from 1.0,*a~-per rating he will not cover water valves or manholes
with landscaping.
3. Rephce I water valve cap on east side of bui~n~ and paint it blue.
4. NeM to place blue buttons in street at all F.H. to mark F.H.
Remove difl from aromld vaults & meter can from drainage (per construcflou
company).
Irrigation D.C. needs to be tested and paperwork sent over.
7. Irrigation meter needs to be turned on to check for leak in meter can,
8. Fire line to builrli~. (Valve is cut off at this time)
CITY OF COPPI~LL Ptflt&lC IYOAg~ DEPAItTMKNT