Loading...
ST0004-LR010817 (2) ~ GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS  DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 Concrete Compression Test Report Client: The City of Coppeil Report Distribution: (1) The City of Coppell Project: Freeport Parkway Pavement (1) Quantam Contracting Repair TMI Report No.: DC01-066-024 Report Date: 08/17/2001 Specifications Test Data Strength 4000 psi @ 28 Days Placement Date 07/19/2001 Slump 5 in max Sampled By Zuhair Shubbar Air Content 3 % min 6 % max Weather Clear Concrete Temperature n/a Supplier/Mix Hanson/9636 Ambient Temperature n/a Air Content Method ASTM C-231-B Ticket Number: 819526 Time Batched: 3:15 pm Time Sampled: 4:10 pm Slump: n/a Air Content: n/a Unit Weight: n/a Concrete Temperature: 1000 F Ambient Temperature: 99° F Yardage (c.y.): n/a Placement Location: Paving Sample Location: Station 8+50, North bound lane of Freeport Parkway Age. Max Load Area Stren.clth Fracture Set # Cyl~der Test Date (days) (lbs, force) (sq.in,) (psi] Type 2 07190107 07/26/2001 7 114010 28.27 4030 unbonded cap 2 07190108 07/26/2001 7 125550 28.27 4440 unbonded cap 2 07190109 08/02/2001 14 135540 28.27 4790 unbonded cap 2 07190110 08/02/2001 14 142160 28.27 5030 unbonded cap 2 07190111 08/16/2001 28 156110 28.27 5520~ unbonded cap 2 07190112 08/16/2001 28 163110 28.27 5770f unbonded cap 28 day average 5650 Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231~_.~'~,~_ ,~..l..~ S upe ~isor was in formed of high concretete m perature. ..... TERRA-~AR, lng. ~~~~~ The result8 presented in ~his repor~ pe~in only ~o ~he spegifio iJems ~esJed. This repor~ w~s produged for ~he exclusive use of Jhe ~lienL Any repr~uafion of ~hi8 repo~, or ~ny p~r~ ~herein, is sJri~ly prohibited wi~hou~ ~he express written gonsenl of T~I.