Loading...
ST9302-CS010731 (2) %T'e From: Suzan Taylor To: Sharon Logan Date: Tue, Jul 31, 2001 9:33 AM Subject: WebPage Traffic Closure Update Priority: 1 WebPage Location: Road Closures Removal Date: After August 20 Submitted By: Suzan Taylor - Engineering Sharon: This is a high profile intersection closure and it needs to be very visible. I put it under Road Closures, however you may know of a better location. Thanks Suzan CC: Eddie Johnson SANDY LAKE ROAD / MACARTHUR BOULEVARD INTERSECTION CLOSURE The Sandy Lake Road / MacArthur Boulevard intersection will be closed to all traffic during the weekends of August 10 - 12, and August 17 - 19, 2001 for reconstruction. The City apologizes for any inconvenience that this closure causes, however, construction of the intersection in this manner will provide for a safer and more expedient construction. Weekend of August 10 - 12 The contractor, if he chooses, will start Friday evening, closing down the intersection and lowering it to grade. He will undercut the intersection and install cement treated base approximately 8" lower than the surrounding street. He will seal the base material and provide ramps from the surrounding streets to the new cement treated base and open the intersection back up prior to Monday morning. Traffic will drive on this treated base for one week. Weekend of August 17- 19 The contractor, if he chooses, will start Friday evening, closing the intersection and installing reinforcing steel. Saturday aftemoon the contractor will pour high early- strength concrete over the intersection. The high early-strength concrete typically reaches its design strength within 24 hours. Concrete cylinders will be tested on Sunday afternoon so the road can be opened up to traffic by Monday morning. If you have any questions, please contact Garreth Campbell, Project Inspector, at 972- 304-3685 or the Engineering Department at 972-304-3679.