Loading...
ST9302-CS010719FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 July 19, 2001 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project ~: ST 93-02 Kimley-Hom Project ~: 06940600 D~ Project ~: 98-311F Dear Mr. Griffin: We are in receipt of change order #7 for the referenced project. As you are aware, EBCC did not evaluate and provide pricing for the configuration o£the intersection, dated May 21, 2001, that you have directed EBCC to construct. The price for the stamped concrete is acceptable; however, the price for the 8" concrete paving within the limits of the stamped concrete pedestrian crossings will need to be $66.68 per SY. As stated on previous occasions, the work associated with the Sandy Lake/MacArthur intersection is significantly different than the work priced in the original contract; therefore, new pricing is required. Additionally, it is our understanding that the median noses and ADA ramps will be measured and paid utilizing the stamped concrete pay item. If you have any questions regarding this information, don't hesitate to contact our office. R~ h~~ IlC_.~rely' onstrult~on Company Web~eel~' ' Project Manager xc: Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER