Loading...
ST9302-CS010707FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 July 7, 2001 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Horn Project #: 06940600 DWUProject #: 98-311F Dear Mr. Griffin: It is our understanding that the 21" PVC sanitary sewer originally included in the MacArthur/Sandy Lake intersection scope of work will not be constructed. During pricing negotiations for the MacArthur/Sandy Lake intersection change order, EBCC was directed to maintain existing contract prices for all new areas of work that had pay items in the base contract, even though the nature of the added work was different in character than the original work. EBCC was further directed to distribute price increases associated with the increased difficulty of the intersection work to the "new" bid items. EBCC complied with these directives and distributed $37,264.00 in cost, not associated with installation of the 21" sanitary sewer, to the 21" sanitary sewer bid item. As a result, elimination of the 21" PVC sanitary sewer, a "new" pay item, will reduce the available dollars to construct the intersection by $37,264.00. Please add an equitable adjustment pay item to the next change order for $37,264.00 to compensate EBCC for these costs. If you have any questions regarding this information, don't hesitate to contact our office. Sincerely, ~C~stru/.~on Company Robert D. Weber Project Manager xc: Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER