Freeport NIP(7.3)-CS010305FILE
March 5, 2001
Jeff Langston, Project Manager
Duke-Weeks Reality Corporation
5495 Belt Line Rd., Suite 360
Dallas, TX 75240
RE: Freeport North Lot 2, Block A (Freeport VII) (REVISED)
Fee Assessment Letter
Dear Mr. Langston:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with
a copy of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $42,447.04 and forward to
the Finance Department along with a copy of the Fee Assessment table. This amount is a
portion of the assessed fees that need to be paid prior to Council approval. Also provide a
copy of the Engineer's estimate or contract to our office so the construction inspection
fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to
verify the payment of required fees and insure a successful beginning of this project. We
look forward to working with you on this project. If you have any questions, please
contact me.
Sinc. erely, .
Michael A. Martin, P.E.
Assistant City Engineer
CC:
Jennifer Armstrong, Finance Director
Debbie Ingram, Secretary
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
255 PARKWAY 111' P.O.I=IOX 4?8 ~' COPPELL TX 76019 'A'TEL 972/462 0022 1~'FAX 972/304 3673
DEVELOPMENT FEE TABLE
Project: Freeport North Lot 2, Block A (Freeport VII) (REVISED)
Date: 3/5/Ol
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $8,325.00 $8,325.00
(100 % due prior to Council Approval)
Water Tap Inspection Fee $200.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $189.37
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $5,450.80
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $90.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $3,600.00 $3,600.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $30,522.04 $30,522.04
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project II
Construction Inspection Fee Information not Available
II
TOTAL $48,512.21
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $42,447.04
DEVELOPMENT FEE WORKSHEET
PROJECT: Freeport North Lot 2, Block A (Freeport VII) (REVISED)
DATE: 3/5/01
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 - 2 inch = 8 ESU's
1 - 2 inch = 8 ESU's
0 = 0 ESU's
1 - 8 inch = 2.5 ESU's
1 - 10 inch = 0 ESU's
Total #: 18.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 4 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total 0: 1 Domestic Meter(s) @ $189.37
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total 0: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 1 Fireline Meter(s) @
Total #: 1 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$189.37
$0.00
$2,157.38
$3,104.05
Domestic Water Meter Deposit Fee:
Total 0: I Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: I Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: I Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Page 1
$8,325.00
$200.00
$189.37
$189.37
$0.00
$2,157.38
$3,104.05
$35.00
$90.00
$3,600.00
$50.00
$50.00
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only): * Preliminary plat approved:
Single-family @ $0,00 per lot
Multi-family @ $0.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
$0.00
$0.0o
$30,522.04
Information not Available
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Freeport North Lot 2, Block A (Freeport VII) (REVISED)
3/5/01
ROADWAY' IMPACT FEE:
Service Area *
Category **
Land Use **
Building Area (sO
Development Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Uni0 x (Fee per Vehicle Mile)
4
Industrial
General Li~,ht Industrial
383,925
383.93
1.~
$3OO
$122,088.15
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
Percent of Credit Toward Roadway Impact Fees 75 %
Total Credit $91,566.11
The reason for the revised impact fee is the building square footage changed from 369,800 to 383,925.
See attached Sheet showing the revised building square footage
- '~)3'/~5/01 11:34 FAI[ 972 361 (~ ~ ~l 6E]E~ ~
, DUKE-~S R~ALTY ~] 00!
I .Duke-wecks
REALTY (~ORPORAT~ON
Number of Pages Attached (including cover) I
To:
Con3oa~y
Phone:
Fax:
Mike Martin
City of Coppell
(972) 304-3570
March 5, 2001
From: Na~ Jeff Langston
r~ Project Manager
c~y Duke-Weeks Realty Corporation
Phone: (972) 361-6707
Fax: (972) 361-6800
In order for you to calculate the revised Roadway impact fee for our Freeport VII project, please see the following info
regarding the building:
Building Size - 383,925 s.f.
Anticipated finishout to be 5% office & 95% warehouse
if you need any other info please give me a call at (972) 361-6707. Please let me know what the revised amount will be
as soon as you can and I will get the check processed. Raymond Construction will be processing the check for the
other remaining impact fees associated with this project.
Thanks