Freeport NIP(7.3)-CS010305FILE March 5, 2001 Jeff Langston, Project Manager Duke-Weeks Reality Corporation 5495 Belt Line Rd., Suite 360 Dallas, TX 75240 RE: Freeport North Lot 2, Block A (Freeport VII) (REVISED) Fee Assessment Letter Dear Mr. Langston: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $42,447.04 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sinc. erely, . Michael A. Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Debbie Ingram, Secretary Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services 255 PARKWAY 111' P.O.I=IOX 4?8 ~' COPPELL TX 76019 'A'TEL 972/462 0022 1~'FAX 972/304 3673 DEVELOPMENT FEE TABLE Project: Freeport North Lot 2, Block A (Freeport VII) (REVISED) Date: 3/5/Ol TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $189.37 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $5,450.80 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $30,522.04 $30,522.04 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project II Street Sign Fee Information not Available (100% due prior to Acceptance of Project II Construction Inspection Fee Information not Available II TOTAL $48,512.21 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $42,447.04 DEVELOPMENT FEE WORKSHEET PROJECT: Freeport North Lot 2, Block A (Freeport VII) (REVISED) DATE: 3/5/01 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 2 inch = 8 ESU's 1 - 2 inch = 8 ESU's 0 = 0 ESU's 1 - 8 inch = 2.5 ESU's 1 - 10 inch = 0 ESU's Total #: 18.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total 0: 1 Domestic Meter(s) @ $189.37 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total 0: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 1 Fireline Meter(s) @ Total #: 1 Fireline Meter(s) @ (100% due prior to issuance of water meters) $189.37 $0.00 $2,157.38 $3,104.05 Domestic Water Meter Deposit Fee: Total 0: I Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: I Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page 1 $8,325.00 $200.00 $189.37 $189.37 $0.00 $2,157.38 $3,104.05 $35.00 $90.00 $3,600.00 $50.00 $50.00 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: Single-family @ $0,00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.00 $0.0o $30,522.04 Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Freeport North Lot 2, Block A (Freeport VII) (REVISED) 3/5/01 ROADWAY' IMPACT FEE: Service Area * Category ** Land Use ** Building Area (sO Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Uni0 x (Fee per Vehicle Mile) 4 Industrial General Li~,ht Industrial 383,925 383.93 1.~ $3OO $122,088.15 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Percent of Credit Toward Roadway Impact Fees 75 % Total Credit $91,566.11 The reason for the revised impact fee is the building square footage changed from 369,800 to 383,925. See attached Sheet showing the revised building square footage - '~)3'/~5/01 11:34 FAI[ 972 361 (~ ~ ~l 6E]E~ ~ , DUKE-~S R~ALTY ~] 00! I .Duke-wecks REALTY (~ORPORAT~ON Number of Pages Attached (including cover) I To: Con3oa~y Phone: Fax: Mike Martin City of Coppell (972) 304-3570 March 5, 2001 From: Na~ Jeff Langston r~ Project Manager c~y Duke-Weeks Realty Corporation Phone: (972) 361-6707 Fax: (972) 361-6800 In order for you to calculate the revised Roadway impact fee for our Freeport VII project, please see the following info regarding the building: Building Size - 383,925 s.f. Anticipated finishout to be 5% office & 95% warehouse if you need any other info please give me a call at (972) 361-6707. Please let me know what the revised amount will be as soon as you can and I will get the check processed. Raymond Construction will be processing the check for the other remaining impact fees associated with this project. Thanks