Loading...
Freeport NIP(7.4)-CS000926 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Mike Martin, Asst. City Engineer Glenn Hollowell, Director of Public Works Greg Jo~hie.f Building Official Tra~~m~, Fire Marshal From: Lal~~onstruction Inspector Date: Sept6, 2000 RE: WALK-THRU for Freeport:l~arkway, Bldg. VI, Lot 3, Block A (Royal Lane ~ Creekview) A final walk-thru for streets, utilities and drainage on the referenced project has been scheduled for Wednesday, October 4, 2000 at 8:30 a.m. If I can be of further assistance please let me know. cc: Lee Stone, Commercial Inspector Mike Worley, Hill & Wilkinson (fax 214-299-4444) Chris Jackson, Hill & Wilkinson (fax 214-299-4444) Amy Braddock, Calttar Const (fax 972-838-2299) Potter Concrete (fax 214-689-1066) "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"