Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
MA 0101-CS 980120
ROYAL LANE AND SANDY LAKE 4 LANE AND 2 LANE ITEM DESCRIPTION NO. 1 MOBILIZATION 2 GRADING 3 PAVING 4 LIME STABILIZATION 5 LIME STABILIZATION 6 REMOVE ASPH 7 REPL. ASPH 8 2-8X4 9 2-7X4 10 7X4 11 5X4 RCB 1254" 13 48" 14 24" RCP 15 10' RCI 16 Y' INLET 17 2-8X4 HDWL SUB TOTAL CONTENGENCY TOTAL SAY QUANITY UNIT I LS 40000 CY 10000 SY 10600 SY 170 TON 1000 CY 560 TON 700 LF 550 LF 500 LF 500 LF 300 LF 420 LF 600 LF 14 EA 5 EA 2 EA 20% Sheet1 UNIT PRICE 15,000.00 3.00 25.00 2.50 100.00 10.00 50.00 625.00 570.00 285.00 250.00 105.00 95.00 50.00 3,000.00 2,500.00 5,000.00 TOTAL $ 15,000.00 $ 120,000.00 $ 250,000.00 $ 26,500.00 $ 17,000.00 $ 10,000.00 $ 28,000.00 $ ;4:37,500.00" $ ~31~500.00 $ ~42,500.00 $ 125,000.00 $ 31,500.00 $ 39,900.00 $ 30,000.00 $ 42,000.00 $ 12,500.00 $ 10,000.00 $1,650,900.00 $ 330,180.00 $1,981,080.00 $ 2,000,000.00 Page I I ONSITE 3400 FEET 41' B-B ITEM DESCRIPTION NO. I MOBILIZATION 2 GRADING 3 PAVING 4 LIME STABILIZATION 5 LIME STABILIZATION 6 2-8X4 7 2-7X4 8 7X4 9 5X4 RCB 1054" 11 48" 12 24" RCP 13 10' RCI 14 Y' INLET 15 2-8X4 HDWL 16 12" WATER 17 8" WATER 18 FIRE HYDRANTS 19 12" VALVES 20 6" VALVES 21 10" SANITARY 22 MAN HOLES QUANITY 1 30000 15500 16300 260 500 600 600 0 400 1400 600 14 5 2 3400 800 12 12 12 2500 6 UNIT LS CY SY SY TON LF LF LF LF LF LF LF EA EA EA LF LF EA EA EA LF EA Sheet1 UNIT PRICE $15,000.00 $ 3.O0 $ 25.00 $ 2.5O $ 100.00 $ 625.00 $ 570.00 $ 285.00 $ 250.00 $ 105.00 $ 95.00 $ 50.0O $ 3,000.00 $ 2,500.00 $ 5,000.00 $ 50.00 $ 40.00 $ 2,000.00 $ 1,500.00 $ 900.00 $ 30.00 $ 3,000.00 TOTAL $ 15,000.00 $ 90,000.00 $ 387,500.00 $ 40,750.00 $ 26,000.00 $ 312,500.00 $ 342,000.00 $ 171,000.00 $ - $ 42 000.00 $ 133000.00 $ 30 000.00 $ 42 000.00 $ 12 500.00 $ 10 000.00 $ 170 000.00 $ 32,000.00 $ 24,000.00 $ 18,000.00 $ 10,800.00 $ 75,000.00 $ 18,000.00 SUB TOTAL CONTENGENCY TOTAL SAY 20% $ 2,002,050.00 $ 400,410.00 $ 2,402,460.00 $ 2,500,000.00 Page 2 i