WA9302-CS 950410 !~h i ~ek -_T~cobs ~ F ink I e~ 214~;~10204-
SHIMEK, ]ACOBS & ~IN~EA
CONSULTING ENGINEERS
8333 DOUGLAS AVENUE, ~820
DALLAS, TEXAS ?5225
Fax Number: (214) 361- 0204 Phone Number: (214) 361- 7900
Date:__ .~././~_~2-q Receiving Fax Number: ,
Number of Pages Transmitted (including ~is one)
To: Mike Martin .. .
Mes~ge:__~ I%
If tho numbtr of pagea ¢atlod for ~ Bot revived or a~e not ~loat please gall (214) 361-7900. :
Sh i mek , ,.To. cobs 8,, F ink I co. 214~;610204 P, 02
INDEX
VILLAGE PARKWAY GROUND STORAGE RESERVOIR NO. 2
SPECIAL CONDITIONS
SC,0 ! Time Allotted for Completion
SC.02 Permits and Right-of-Way
SC.03 Construction S~hedule
SC.04 Property Lines and Monuments
SC.05 Fences and Drainage Channels
SC.06 Public Utilities and Other Property to be Changed
SC.07 Existing Utilities and Service Lines
SC.08 Use of Explosives
8C.09 Construction in Publi~ Roads and Private Drives
SC. 10 Barricades, Lights and Watchmen
SC. 11 Lines and Grades
SC.12 Contractor to Furnish Cost Breakdown
SC. 13 Concrete Mix Design
SC, 14 Wage Rates
SC.15 Trench Safety Systems
SC. l 6 Copies of Plans and Specifications
SC, 17 Antitrust
SC.13 Small Claims for Danaages or Injury
SC. 19 Testing and Quality Control
SC.20 Precast, Wire-Wound, Prestressed Concrete. AWWA, D t 10 Type III, Ground Storage Rese~,oir
with Steel Diaphragm
SC.21 Coating System
SC.22 Level Control
SC.23 Electrical (General)
8C-24 Electrical Raceways
SC.25 Electrical Miscellaneous
SC.26 Trees, Shrubs, and Ground Cover ~kl ~
SC.27 Lawns and Grass ~f_~ {~) i~
Sh i mek , .,.Totcob.~. ~ F ink Ieo. 21436 10204
trash and debris shall be removed from the
site daily as the work progresses.
13. _F_inal Observation Prior To Acceptaace
After testing and final adjustment, the
Contractor shall operate each system in its
entirety for the Owner's representative for
final observation. Any items deemed not
acceptable by the Owner's representative
shall be reworked to the complete
"" c-'- tis ion of the Representative
SC.29 ~
· The Contractor shall furnish and install one flee
· standing project sign for this project at location
pproved by the City. As the city council or city
staff changes, the Contractor shall immediately,
upon written direction, update the project sign at no
additional compensation. The Contractor shall
.~, maintain the project signs through the entire project
tune. The project signs shall be of the dimensions,
materials and character as shown on the project sign
detail at the end of these Special Conditions. No
direct payment shall be made for the project sign,
5-35
_._Shimeke. J~oob~ ~ Finkle~ 214~610204 P.04