Loading...
Freeport NIP(7.3)-CS 991216CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: FREEPORT NORTH LOT BLOCK FREEPORT BUILDING VII SITE PLAN P & Z HEARING DATE: C.C. HEARING DATE: LOCATION: December 16, 1999 January 11, 2000 Along the west side of S. Royal Lane, approximately 470' south of Creekview Drive. SIZE OF AREA: Approximately 18.1 acres of property; for construction of a 386,150 sf office/warehouse facility CURRENT ZONING: REQUEST: LI (Light Industrial). Site Plan approval for Building VII. APPLICANT: Architect: Hardy McCullah/MLM Architects 12221 Merit Drive, #280 Dallas, TX 75251 (972) 385-1900 FAX: (972) 385-1937 Engineer: Pacheco Koch Consulting Engineers 9401 LBJ Freeway, #300 Dallas, TX 75243 (972) 235-3031 FAX: (972) 235-9544 HISTORY: This property has been zoned industrial for more than 25 years. The property was platted in 1984. TRANSPORTATION: Royal Lane is a C4D/6 four-lane divided collector built to standard in a 10ft-wide fight-of-way capable of accommodating a 6-lane divided thoroughfare. Creekview Drive is a C2U two-lane undivided collector built to standard within a 60'-wide right-of-way. SURROUNDING LAND USE & ZONING: North- South - East - West - vacant; "Lr' Light Industrial vacant; "LI" Light Industrial office/warehouse; "LI" Light Industrial vacant; "LI" Light Industrial Item # 17 COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for light industrial and showroom uses. DISCUSSION: Staff's main concern is that an off-site right-of-way dedication is required for the future extension of Creekview Drive. The thoroughfare plan shows the future Creekview Drive to be a C2U, 2 lane undivided thoroughfare to be contained in a 60'-wide right-of-way connecting the existing Creekview with Bethel Road to the south. The applicant is well aware of the situation and is currently negotiating with the property owner to the west. Before a plat is recorded with the County, an off-site right-of-way dedication must be recorded and provided to the City. Engineering staff is receptive to allowing the develbper to build the full width of the future Creekview Drive for half the length of the western property line of Lot 2, Block 2 and would encourage the developer to straighten the alignment of Creekview Drive. Eventually, when the property to the west develops, the full width of the remaining portion of Creekview Drive will have to be built. Until the off-site right-of-way dedication is recorded, Lot 2, Block A is not a buildable lot because it does not abut a dedicated street or a private road. Assuming that Lot 2, Block A is a buildable lot, the 386,150 sf office/warehouse facility being proposed has 28 dock doors on the eastern elevation and another 28 dock doors facing the furore Creekview Drive. By ordinance, loading areas facing the street need to be screened with a 6- ft high screening wall. The applicant is requesting 10'-high Leyland Cypress and 3'-high shrubs on top of berms approximately 4' in height, be accepted in lieu of a 6'-high masonry screening wall. Also, planting islands have been incorporated into staircases at the truck courts with one Aristocrat Pear to be planted per island. The landscape architect indicates in a letter dated December 7, 1999, that the future right-of-way acquisition along Creekview Drive along the western side of both sites is accurately depicted in the landscape plan in accordance with the site plan. If the developer decides to straighten the alignment of future Creekview it will impact the western landscape buffer for a distance of approximately 500'. Currently, both the site plan and landscape plan indicate the applicant is providing a 60'-wide landscape buffer for the 500' of future frontage. According to staff's conversation with the landscape architect, the landscape tabulations only reflect an average of a 30'-wide landscape buffer being provided along furore Creekview Drive. The calculations do not reflect the extra landscaping being proposed. If that is the case, the realignment of Creekview Drive should not impact the landscape calculations, however, it will impact the proposed berms and it will require some modifications to the proposed living screen. Item # 17 Approximately 90% of the interior space will be devoted to warehouse space and the remaining 10% space will be used for office. Applicant is providing 473 parking spaces as required by code. A word of caution, that the site can not accommodate more than 37,200 sf of interior office space without incurring a parking shortage. The building elevations indicate a painted tilt wall structure in white and light gray tones with gray tinted glass, very comparable to the Freeport V building and the existing facilities in the Freeport North Industrial park. The site plan shows a 60 square foot monument sign along the future Creekview frontage. The sign identifies the building rather than the tenants and has a gray tile sign face with black/silver letters with the logo etched in a pre-cast stone. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Planning staff recommends approval of the site plan subject to the following conditions being met: 1) Before the replat is recorded with Dallas County an off-site right-of- way dedication for Creekview Drive should be recorded and provided to the City. 2) The construction of the full width of the future Creekview Drive for half the length of the western property line of Lot 2, Block A and the straightening of the aligranent of Creekview Drive will need to be coordinated with the Engineering Department. (See Engineering Department comments) 3) Modify the living screen proposed to screen the track courts facing the furore Creekview Drive to accommodate the realignment of the future Creekview Drive. 4) Obtain City Council approval for the living screen in lieu of a 6'-high masonry screening wall for loading areas facing the future Creekview Drive. 5) Limit interior office space to 37,200 sfor less. 6) Submittal and approval of a preliminary irrigation plan. 7) A 50% landscaping credit will be applied bringing the total retribution due equaling 142 inches of trees. (See Leisure Services comments) 8) Approval of the color board specifying all exterior building materials. ALTERNATIVES: 1) Recommend approval of the request. 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later date. Item//17 ATTACHMENTS: 1) :) 3) 4) 5) Site Plan Landscape Plan Building Elevations Linda Tychefs letter dated December 7, 1999 Departmental Comments Item # 17 1~' - ''~ 1999 DEVELOPMENT REVIEW C MZTTEE - ENGINEERING ITEM: Freepo~ No~h, Lot 2, Block A, Freepo~ Budding VII Site Plan R~i~, Mlow the development of a 386,150 square foot o~c~warehouse facili~ on approximately 18.1 acres of prope~, located along the west side of S. Royal Lane, approximately 470' south of C~e~ Drive, at the request of Hardy McCulla~LM Architects. DRC DA TE: November 23, 1999 and December 2, 1999 CONTACT: Mike Matin, P.E., Assistant Ci~ Engineer (972-304-3679) COMME~STA~' ~o~r rn~rnrA ov ~FINAL An off-site R.O.W. dedication should be provided for Creekview Drive. The construction of Creekview Drive across the western property line will need to be coordinated with the Engineering Department. 1~×09×99 16:49 ClTY~COPPELL ~ 9?2 ~04 ?092 I DEVELOPMENT REVIEW COMMI2TEE LEISURE SERVICES COMMENTS Ereeport North, Lot 2, Block A, Freeport Building VII, DRC DATE: November 2:3, 1999 and December 2, 1999 CONTACT: Brad Reid, Park Plannin8 DEC -9 1~99 COMMENT STATUS: PRELIMINARY The Tree Survey indicates 284 caliper inches of protected trees to be removed with no existing trees to remain on the site after de~elalnner~t. Therefore, no preser~atio~ credits will be applied for those tre~ being removed. A 50% landscaping credit wilt be at, lied bn'nging the total retribution due equaling 142 inches of trees. BI~ DRCl123j FROM : LINDA TYCHER & ASSOCIAT''-~ INC FAX NO. : 214-'~-1210 '~ Dec, 07 1999 09:40AM P2 December 7, 1999 Ms. Isabel Moro CITY OF COPPELL P.O. Box 278 255 Parkway Blvd. Coppell, TX 75019 Dear Isabel: Per our telephone conversation, we have decided to retain the Leyland Cypress trees on both Freeport VI and VII- instead of changing to Austrian Pines. There is presently a disease affecting Austrian Pines in the mid-west U.S. and along the east coast. This tree is therefore, not available at some nurseries and we are not recommending its use in our design. Leyland Cypress is an excellent screening tree, and it has been specified an installation height of 10 ff. A fully automatic sprinkler system will be designed and installed by a licensed irrigator as noted on all the planting sheets. This irrigation plan will be promptly submitted for approval after the landscape plans are approved. The future right-of-way acquisition along Creekview Drive along the western side of both sites is accurately depicted in the plans in accordance to our communication with the Architect. All berms and planting shown do not conflict with this alignment. Sincerely, Linda Tycher, ASLA LINDA TYCHER & ASSOCIATES, INC. cc: Mr. Kyle McCullah, HARDY M¢CULLAH/MLM ARCHITECTS, INC. LT/dar D,~JI;~. l ¢x3s 7521.] J't ~unc: (214) 7.';fi- 1 ? I ti