Loading...
WA9302-CS 950403 (2) The City With A Beautiful Future Purchasing Department J.R. Ragsdill, C.P.P.B. Purchasing Agent Date: April 3, 1995 Name: GARY HINDRICKS Firm: SHIMEK, JACOBS & FINKLEA Fax Number: 361-0204 From: KAREN DOELLING, PURCHASING Regarding: HERE ARE THE PREVAILING WAGE RATES FOR THE GROUND STORAGE TANK. Number of Pages (including cover sheet): 4 If you do not receive all of the pages, please call Karen Doelling at extension 214. 255 Parkway Boulevard ® P.O. Box 478 ® Coppell, Texas 75019 ® 214-304-3698 ® Fax 214-304-3645 General Decision Number TX930034 Superseded General Decision Nc. TX910034 State: TEXAS Construction Type: Heavy County(ies): DALLAS Heavy Construction, Including Treatment Plants (Does not include water/sewer lines) Modification Number Publication Date 0 02/19/1993 COUNTY(ies): DALLAS ASBEO021C 05/01/1989 Rates Fringes ASBESTOS WORKERS 15.50 3.19 ELEC0059C 06/01/1990 Rates Fringes ELECTRICIANS 17.10 1.60+9% CABLE SPLICERS 18.81 1.60+9% ELEC0059D 06/01/1990 Rates Fringes LINEMEN 17.10 1.60+9% ENGI0714A 06/01 1991 Rates Fringes CRANES: Heavy - hydraulic & conventional cranes 50 tons and over 14.65 2.60 Light - hydraulic & conventional cranes up to 50 tons 13.65 2.60 IRON0481B 01/01/1992 Rates Fringes IRONWORKERS: Reinforcing & Structural 13.61 4.02 PLUM0100B 05/01/1992 Rates Fringes PLUMBERS 17.18 $ 2.63 SHEEOO68B 05/01/1990 Rates Fringes SHEET METAL WORKERS 16.905 2.00 SUTX2034A 09/18/1991 Rates Fringes HEAVY CONSTRUCTION, INCLUDING TREATMENT PLANTS (DOES NOT INLCUDE WATER/SEWER LINES) CARPENTERS 10.536 CONCRETE FINISHERS 9.603 FORM BUILDERS 8.036 FORM SETTERS 9.578 LABORERS: Common 6.379 Utility 6.974 PIPELAYERS 7.961 POWER EQUIPMENT OPERATORS: Backhoe 10 971 Bulldozer 9 942 Front end loader 10 771 Mechanic 9 880 Motor Grader 11 633 Oiler 9 183 Scraper 8 000 TRUCK DRIVERS 7 465 WELDERS: Receive rate prescribed for craft performing operation to which welding is incidental. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a) l(ii)). END OF GENERAL DECISION