WA9302-CS 950301 SHIMEK, JACOBS & FINKLEA
CONSULTING ENGINEERS
Phone: (214) 361-7900 3;.;~;l~x._' ii~"~ ,¢../e_ ~? ~ ....~; ¢ '
FAX: (214) 361-0204 , .~ ~
Subject: Ci~ of Coppell
Village Parkway Ground Storage Tank No. 2
Ci~;s Review Commems on Plans and Specs.
Memorandum To: Files
From: Ga~ C. Hendricks Date: March 1, ]995
Review Comments on Plan Sheets.
1. Cover Sheet
a) ~ty Council Members: Do we add member No. 7 as per spec review
b) Aissistant City Manager Clay Phillips, also Fire Chief?.??
c) ~./C~pproval Block signed by Mayor, Manager, Director of Public Works???
2. Irrigation Plan Sheet No. 8
a,)r/ Backflow preventer detail *** Use City of Coppell's Detail
b) Freeze and Rain Sensors Manufacturer ??? 'L;4, ,~ v, ~s S ~ .~T~-
3. All other plan sheets refer to mark ups
4. Ladder Cage Details and Ladder Lock
Review Comments on Specifications
Page 8 Contract Time:
Revise to 250 Calendar Days. Does the City want to include the contract time in the bid or
/,~,,~,_~. ~ ";r~:~ "specifically set the time?
g
.~ / (~, ~ i~ Pa e 28 Overtime.
Refer to page 35 & 42
3. Page 45 Silicone Joint Sealer: Need CiW's detail
~Page 49 Poly wrap BF Valves
5. Page SC-6: Testing.
Owner contracted or Contractor' s responsibiliW??
6. Page SC-32 Water for Construction
I~igation System, etc.
SHIMEK, JACOBS & FINKLEA
CONSULTING ENGINEERS
Phone: (214) 361-7900
FAX: (214) 361-0204
Subject: City of Coppell
Village Parkway Ground Storage Tank No. 2
City's Review Comments on Plans and Specs.
Memorandum To: Files
From: Gary C. Hendricks Date: March 1, 1995
Other Discussion Items
· Specifications page 4: Qualification of Bidders-- Submit at bid or as requested from apparent low
bidders??
· Specifications page 4: Qualification of Bidder D. Financial: Revised to"most current certified financial
statement
· Specifications page SC-8: Stainless Steel overflow, inlet and outlet connections.
~,'~ Standard General Conditions of the Constr~tr. act-- (Golden Rod Pages). Can we get a better
copy of this set for reproduction??
· Bid Date:
· First Public Notice Date:
· Second Public Notice Date:
· Notice to Contractors
* Other Bid Notice Requirements:
/ ,,
· Other Comments: