Loading...
WA9302-CS 950301 SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS Phone: (214) 361-7900 3;.;~;l~x._' ii~"~ ,¢../e_ ~? ~ ....~; ¢ ' FAX: (214) 361-0204 , .~ ~ Subject: Ci~ of Coppell Village Parkway Ground Storage Tank No. 2 Ci~;s Review Commems on Plans and Specs. Memorandum To: Files From: Ga~ C. Hendricks Date: March 1, ]995 Review Comments on Plan Sheets. 1. Cover Sheet a) ~ty Council Members: Do we add member No. 7 as per spec review b) Aissistant City Manager Clay Phillips, also Fire Chief?.?? c) ~./C~pproval Block signed by Mayor, Manager, Director of Public Works??? 2. Irrigation Plan Sheet No. 8  a,)r/ Backflow preventer detail *** Use City of Coppell's Detail b) Freeze and Rain Sensors Manufacturer ??? 'L;4, ,~ v, ~s S ~ .~T~- 3. All other plan sheets refer to mark ups 4. Ladder Cage Details and Ladder Lock Review Comments on Specifications Page 8 Contract Time: Revise to 250 Calendar Days. Does the City want to include the contract time in the bid or /,~,,~,_~. ~ ";r~:~ "specifically set the time? g .~ / (~, ~ i~ Pa e 28 Overtime. Refer to page 35 & 42   3. Page 45 Silicone Joint Sealer: Need CiW's detail ~Page 49 Poly wrap BF Valves 5. Page SC-6: Testing. Owner contracted or Contractor' s responsibiliW?? 6. Page SC-32 Water for Construction I~igation System, etc. SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS Phone: (214) 361-7900 FAX: (214) 361-0204 Subject: City of Coppell Village Parkway Ground Storage Tank No. 2 City's Review Comments on Plans and Specs. Memorandum To: Files From: Gary C. Hendricks Date: March 1, 1995 Other Discussion Items · Specifications page 4: Qualification of Bidders-- Submit at bid or as requested from apparent low bidders?? · Specifications page 4: Qualification of Bidder D. Financial: Revised to"most current certified financial statement · Specifications page SC-8: Stainless Steel overflow, inlet and outlet connections. ~,'~ Standard General Conditions of the Constr~tr. act-- (Golden Rod Pages). Can we get a better copy of this set for reproduction?? · Bid Date: · First Public Notice Date: · Second Public Notice Date: · Notice to Contractors * Other Bid Notice Requirements: / ,, · Other Comments: