Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Freeport NIP(2.5)-LR 980415 (4)
' .... I=1 IE:f~: 1:~ I E~ I--I1:~ I r'l ~:: IE:F:;IlrlI:~ GEOTECHNICAL AND J~ ~ r'-I U F=j ENVIRONM£NTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Northpoint Distribution Center Royal Lane at Northpoint Drive Coppell, Texas REPORTED TO: Myers & Crow Company, Ltd. REPORT NO. 53 3811 Turtle Creek Boulevard REG PROJECT NO. 4115 Suite 730 SAMPLE DATE: 04-15-98 Dallas, Texas 75219 TECHNICIAN: B. Pitts ATTN: Mr. Richard Crow CONTRACTOR: McFadden & Miller Location of Sample 1 Paving: 225'S, 175'E of SW Bldg. Corner 40/340 2 Paving: 125'S, 225'E of SW Bldg. Corner 220/340 Design Information 1 TXl g643 3000 2 TXl 9643 3000 Test Results 1 598 04-22-98 7 87930 3110 598 05-13-98 28 121680 4310 598 05-13-98 28 123410 4370 4340 2 599 04-22-98 7 82220 2910 599 05-13-98 28 114000 4030 599 05-13-98 28 116430 4120 4080 Cylinder Data 1 598 5.50 65 76 4.4 7:50 AM 1025276 2 599 5.00 72 80 4.4 11:10 AM 1025671 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019