Freeport NIP(2.5)-LR 980415 (5) I=j E E t'~I E r-ii~ ici E E RICI
GEOTECHNICAL AND
I~NVIP~ONHENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Northpoint Distribution Center
Royal Lane at Northpoint Drive
Coppell, Texas
REPORTED TO: Myers & Crow Company, Ltd. REPORT NO. 54
3811 Turtle Creek Boulevard REG PROJECT NO. 4115
Suite 730 SAMPLE DATE: 04-15-98
Dallas, Texas 75219 TECHNICIAN: B. Pitts
ATTN: Mr. Richard Crow
CONTRACTOR: McFadden & Miller
Location of Sample
' ;1 Piers: G-2.2, G-2.6, F-26 10/42 J
Design Information
[ 1 ~kl 45 3000
Test Results
1 600 04-22-98 7 78500 2780 J
600 05-13-98 28 110660 3920 J
600 05-13-98 28 112710 3990 3960 J
Cylinder Data
J 1 600 5.00 72 80 N/A 2:15 PM ;i0'26198
Distribution: (4) Myers & Crow Company, Ltd./ Submitted by:
Mr. Richard Crow
(1) AECC, Inc./Mr. Andy Brundige REED ENGINEERING GROUP, INC.
(1) Dockery Engineering/Mr. Bill Wray
(1) McFadden & Miller/ Original Signed By
Mr. Jon Jacobson
(1) Halff Associates/Mr. Pat Acker Keith E. Atkins
(1) Pritchard Associates/ KEAJajw
Mr. Jim Pritchard
(1) O'Brien & Associates/
Mr. Mick Granlund
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019