Loading...
Freeport NIP(2.5)-LR 980427 I~: t-~ I E I--II~i I r'll~: E RII-'II:~ GEOTECHNICAL AND J~ J~J r'l L=J JC~J ENVIRONMI:NTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Northpoint Distribution Center Royal Lane at Northpoint Drive Coppell, Texas REPORTED TO: Myers & Crow Company, Ltd. REPORT NO. 60 3811 Turtle Creek Boulevard REG PROJECT NO. 4115 Suite 730 SAMPLE DATE: 04-27-98 Dallas, Texas 75219 TECHNICIAN: F. Gomez ATTN: Mr. Richard Crow CONTRACTOR: McFadden & Miller Location of Sample 1 Bottom of Panel #84 40/440 2 Top of Panel #87 140/440 3 Bottom of Panel #93 230/440 4 Top of Panel ~69 330/440 Design Information 1 TXI 46 4000 2 TXI 46 4000 3 TXI 46 4000 4 TXI 46 4000 Test Results 1 912 05-04-98 7 86460 3060 912 05-25-98 28 128970 4560 912 05-25-98 28 128450 4550 4560 2 913 05-04-98 7 84300 2980 913 05-25-98 28 121020 4280 913 05-25-98 28 128340 4540 4410 3 914 05-04-98 7 78890 2790 914 05-25-98 28 121800 4310 914 05-25-98 28 117630 4160 4340 4 915 05-04-98 7 89180 3160 915 05-25-98 28 121610 4300 915 05-25-98 28 121080 4290 4300 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Cylinder Data 1 912 4.50 52 66 N/A 7:50 AM 1034179 2 913 5.25 55 67 N/A 9:15 AM 1034369 3 914 5.25 56 67 N/A 10:15 AM 1034464 4 915 4.75 57 67 N/A 12:15 PM 1034615 Distribution: (4) Myers & Crow Company, Ltd./ Submitted by: Mr. Richard Crow (1) AECC, Inc./Mr. Andy Brundige REED ENGINEERING GROUP, INC. (1) Dockery Engineering/Mr. Bill Wray (1) McFadden & Miller/ Original Signed By Mr. Jon Jacobson (1) Pritchard Associates/ Keith E. Atkins Mr. Jim Pritchard KENajw (1) O'Brien & Associates/ Mr. Mick Granlund (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone