Freeport NIP(2.5)-LR 980630 (2) GEOTECHNICAL AND ~ I~l D I I p ENVIRONMENTAL CONSULTANTS June 30, 1998 Project No. 4115 Report No. 71 Myers & Crow Company, Ltd. 3811 Turtle Creek Boulevard, Suite 730 Dallas, Texas 75219 ATTN: Mr. Richard Crow Re: Structural Steel Inspection Northpoint Distribution Center Royal Lane at Northpoint Drive Coppell, Texas Gentlemen: Transmitted here are the results of the structural steel inspection performed at the referenced site for Reed Engineering Group, Inc. on June 20, 1998, by Contract Inspection Service. Should you have any questions, please do not hesitate to call. Sincerely, ::: REED ENGINEERING GROUP, INC.'; ' ' ~' .' ' ' Original Signed By Ronald F. Reed, P.E. KEA/RFR/rls copies submitted: (4) Myers & Crow Company, Ltd./Mr. Richard Crow (1) AECC, Inc./Mr. Andy Brundige (1) Dockery Engineering/Mr. Bill Wray (1) McFadden & Miller/Mr. Jon Jacobson (1) HalffAssociates/Mr. Pat Acker (1) Pritchard Associates/Mr. Jim Pritchard (1) O'Brien & Associates/Mr. Mick Granlund i 'i~' ' · (1) City ofcopPell/Mr. Larry Davis · ' (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR. · SUITE400 · DALLAS:TX 75235 · TEL[214] 350 5600 · F~X[214] 350 0019 CONTRA CT INSPECTION SER VICE, Inc. 4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 FAX (817) 246-5889 REPORT OF STRUCTURAL ERECTION INSPECTION Project:' Northpoint Business Center Report No: 9719-8 Coppell TX Attention: Keith Atkins Client: Reed Engineering Group Date of Service: 06-20-98 2424 Stutz, Suite 400 Dallas, TX 75235 Page 1 of 1 REPORT OF' INSPECTION Drawings utilized: Contract Documents/AWS D1.1-96/AISC/SJI Locations/item inspected: Column line 21 to 26 and grid lines A to G Discrepancies/comments: A visual inspection was conducted on the above referenced project with results as follows: 1.) Joist girder to tilt panel connections welds and bearing found to comply. 2.) Joist girder to column connection welds and bearing found to comply. 3.) Bridging installed and found to comply. *4.) Anchor bolts could not be inspected due to leave outs being filled. 5.) Joist to joist girder connections welds and bearing were found to comply. ~m~ract Inspection Service Technician This report is for the exclusive use of our client and shall not be modified or reproduced without written approval from said client