Loading...
Freeport NIP(7.4)-LR000815 TSIT 2502 Gravel Drive - Ft. Worth, TX 76118 817-589-9933 Date: August 15, 2000 Report of Built- Up Roof Inspection PROJECT: Freeport Building VI Copp U, TX GENERAL CONTRACTOR: Hill &: Wilkenson 800 Klien Rd. Suite 100 - Piano, TX 75074 CONTACT: Mike Worley 214-299-4300 Mob. 214-914-7854 ROOFING CONTRACTOR: Pinkston Hollar 2887 A W. Pioneer Pkwy. - Arlington, TX ROOFING FOREMAN: Scott Lockwood Mob. 817-401-0809 MANUFACTORER: Tamko S~tem - Type III Asphalt- 4 ply with aggregate ballast Technical Information WEATHER CONDITIONS: Sunny AMBIENT TEMPERATURES: 80 to 101 FORECAST FOR NEXT DAY: Same SIZE OF CREW 21 TIME: 7 to 4 pm . ROOFING MATERIALS RECEIVED? Yes LABELS ATTACHED? Yes MATERIALS STORED AS REQLrIRED? Yes MATERIALS REJECTED? No SPECIFIED TEMPERATURES: (Asphalt) Kettle: 500 + 25 degrees F. EVT (Application)' 450 +25 degrees F. Ket-fle: 1:30 pm - 500 EVT: 2:00 pm - 460 DECK INSPECTED? Yes CRICKETS LNSTALLED? No Location: NA AREA OF ROOF APPLICATION: A-P/l-4 Number ofSQ's (SF X 100) placed this date: 100 SQ Was placement per specifications: Yes OPERATIONS ~NSPECTED: Installation of 1.6" Iso insulation was mechanically attached to the deck with 2 Vd'fasteners. Fourteen (14) in the corners, tweh, e (12) at the perimeter (eight feet into the field of the roof) and eight fasteners per 4' X 8' insulation board. Application of the V2" fesco insulation was as required. Staggered over the Iso seams and adhered in a solid mopping of hot asphalt. Cant strips were applied at the perimeter and around curbs, set in hot asphalt. Four (4) plies of Tamko fiberglass felts were applied in a lapping fashion., in a solid mopping of hot asphalt. Technician: Carlos Williams Time: 12 to 4pm