Loading...
Freeport NIP(7.4)-LR000816 TS1T 2502 Gravel Drive - Ft. Worth, TX 76118 817-589-9933 Date: August 16, 2000 Report of Buil t-Up Roof Inspection PROJECT: Freeport Building VI Coppell, TX GENERAL CONTRACTOR: Hill &: Wilkenson 800 Klien Rd. Suite 100 - Piano, TX 75074 CONTACT: ,Mike Worley 214-299-4300 Mob. 214-914-7854 ROOFLNG CONTRACTOR: Pinkston Hollar 2887 A W. Pioneer Pkwy. - Arlington, TX ROOFING FORF~MAN: Scott Lodovood Mob. 817-401-0809 MANUrFACTORER: Tamko System - T.vpe ITt Asphalt - 4 ply with aggregate ballast Technical Information WEATHER CONDITIONS: Sunny AMBIENT TEMPERATURES: 83 to 102 FORECAST FOR NEXT DAY: Same SIZE OF CREW: 19 TIME: 7 to 4:30 pm ROOFING MATERIALS RECEIVED? No LABELS ATTACHED? Yes MATERIALS STORED AS REQUIRED? Yes MATERIALS REJECTED? No SPECIFIED TEMPERATURES: (Asphalt) Kettle: 500 + 25 degrees F. EVT (Application): 450 +25 degrees F. Kettle: 1:00 pm - 520 EVT: 1:45 pm - 470 DECK INSPECTED? Yes CRICKETS INSTALLED? No Location: NA AREA OF ROOF APPLICATION: B-P/4-7 Number of SQ's (SF X 100) placed this date: 240 SQ Was placement per specifications: Yes OPERATIONS INSPECTED: Installation of 1.6" Iso insulation was mechanically attached to the deck with 2 ¼"fasteners. Fourteen (14) in the corners, twelve (12) at the perimeter (eight feet into the field of the roof) and eight fasteners per 4' X 8' insulation board. Application of the lA" fesco insulation was as required. Staggered over the Iso seams and adhered in a solid mopping of hot asphalt. Cant strips were applied at the perimeter and around curbs, set in hot asphalt. Four (4) plies of Tamko fiberglass felts were applied in a lapping fashion., in a solid mopping of hot asphalt. Checked roof application of prior day for fishmouths and dry. laps. Technician: Carlos Williams Time: 12 to 4pm