Loading...
Freeport NIP(7.4)-LR000823 TSIT 2502 Gravel Drive - Ft. Worth, TX 76118 817-589-9933 Date: August 23 2000 Report of Built- Up Roof Inspection PROJECT: Freeport Building VI Coppell, TX GENEILA_L CONTKACTOR: Hill & Wilkenson 800 Klien Rd. Suite 100 -Plano, TX 75074 CONTACT: Mike Worley 214-299-4300 Mob. 214-914-7854 ROOFEqG CONTKACTOR: Pinkston Hollar 2887 A W. Pioneer Plcwy. - Arlington, TX ROOFLNG FOtLF~N: Scott Lockwood Mob. 817-401-0809 MANUFACTOILER: Tamko S~tem - T~vpe III Asphalt - 4 ply with aggregate ballast Technical Information WEATHER CONDITIONS: Sunny AMBIENT TEaMPERATURES: 84 to 102 FORECAST FOR NEXT DAY: Same SIZE OF CREW 19 TIME: 7 to 4 pm ROOFING ;MATERIALS RECEiYED? No LABELS ATTACHED? Yes MATERIALS STORED AS REQU~Ii~ED? Yes MATERIALS REJECTED? No SPECIFIED TEMPERATURES: (Asphalt) Kettle: 500 + 25 degrees F. EVT (Application): 450 +25 degrees F. Kettle: 1:00 pm - 500 EVT: 1:15 pm - 455 DECK INSPECTED? Yes CRICKETS INSTALLED? No Location: NA AREA OF ROOF APPLICATION: B-G/13-17 Number ofSQ's (SF X 100) placed this date: 100 SQ Was placement per specifications: Yes OPERATIONS INSPECTED: Installation of 1.6" Iso insulation was mechanically attached to the deck with 2 V4"fasteners. Fourteen (14) in the comers, twelve (12) at the perimeter (eight feet into the field of the roof) and eight fasteners per 4' X 8' insulation board. Application of the V2" fesco insulation was as required. Staggered over the Iso seams and adhered in a solid mopping of hot asphalt. Cant strips were applied at the perimeter and around curbs, set in hot asphalt. Four (4) plies of Tamko fiberglass felts were applied in a lapping fashion., in a solid mopping of hot asphalt. Additional Comments: At location B-G/3-7 the roof was cut out to install skylights. The installation was standard and as required. The roofing foreman was advised to keep the roof clean as debris was scattered throughout. The superintendent of the project was also notified of the same. Technician: Carlos Williams Time: 12 to 4pm