Loading...
Freeport NIP(7.4)-LR000825 TS1T 2502 Gravel Drive - ]Ft. Worth, TX 76118 817-589-9933 Date: August 25, 2000 Report of Built- Up Roof Inspection PROyECT: Freeport Building VI Coppell, TX GENERAL CONTRACTOR: Hill & Wilkenson 800 Klien Rd. Suite 100 - Piano, TX 75074 CONTACT: ,Mike Worlev 214-299-4300 Mob. 214-914-7854 ROOFING CONTRACTOR: Pinkston Hollar 2887 A W. Pioneer Pkwy. - Arlington, TX ROOFING FOREMAN: Scott Lockwood Mob. 817-401~0809 MANL~FACTORER: Tamko S,vstem - T,vpe III Asphalt - 4 ply with aggregate ballast Technical Information WEATHER CONDITIONS: Sunny AMBIENT TEMPERATURES: 82 to 104 FORECAST FOR NEXT DAY: Same SIZE OF CREW: 19 TIME: 7 to 4 pm ROOFING MATERIALS RECEIVED? No LABELS ATI~ACHED? Yes ..MATERIALS STORED AS REQUIRED? Yes MATERIALS REJECTED? No SPECIFIED TEMPERATURES: (Asphalt) Kettle: 500 ± 25 degrees F. EVT (Application): 450 *__25 degrees F. Kettle: 1:00 pm - 500 EVT: 1:30 pm - 460 DECK INSPECTED? '/es CRICKETS INSTALLED? No Location: NA AREA OF ROOF APPLICATION: B-E/17-22 Number of SQ's (SF X 100) placed this date: 240 SQ Was placement per specifications: Yes OPERATIONS INSPECTED: Installation of 1.6" Iso insulation was mechanically attached to the deck with 2 V4"fasteners. Fourteen (14) in the corners, twelve (12) at thc perimeter (eight feet into the field of the roof) and eight fasteners per 4' X 8' insulation board. Application of the 1/2" fesco insulation was as required. Staggered over the Iso seams and adhered in a solid mopping of hot asphalt. Cant strips were applied at the perimeter and around curbs, set in hot asphalt. Four (4) plies of Tamko fiberglass felts were applied in a lapping fashion., in a solid mopping of hot asphalt. Additional Comments: It was determined that the scuppers for the 8" drains are two (2) inches to low. The superintendent - ,Mike Worlev was advised of the problem. Installation of the sir conditioning were £mished on roof area B-P/4-13 Technician: Carlos Williams Time: 12 to 4pm