Loading...
Freeport NIP(7.4)-LR000828 TSFF 2502 Gravel Drive - Ft. Worth, TX 76118 817-589-9933 Date: August 28, 2000 Report of Built- Up Roof Inspection PROJECT: Freeport Building VI Coppe11, TX GENERAL CONTRACTOR: Hill & Wilkenson 800 Klien Rd. Suite 100 -Plano, TX 75074 CONTACT: Mike Worley 214-299-4300 Mob. 214-914-7854 ROOF12NG CONTRACTOR: Pinkston Hollar 2887 A W. Pioneer Pkwy. - Arlington, TX ROOFEXlG FOREMAN: Scott Lockwood Mob. 817-401-0809 MANUFACTORER: Tamko System - Type m Asphalt - 4 ply with aggregate ballast Technical Information WEATHER CONDITIONS: Sunny AMBIENT TEMPERATURES: 81 to 102 FORECAST FOR NEXT DAY: Same SIZE OF CREW: 19 TLME: 7 to 4 pm ROOFEx~G MATERIALS RECEIVED? No LABELS ATFACHED? Yes ,MATERIALS STORED AS REQUIRED? Yes MATERIALS REJECTED? No SPECIFIED TEM. PERATURES: (Asphalt) Kettle: 500 + 25 degrees F. EVT (Application): 450 +25 degrees F. Kettle: 1:00 pm - 500 EVT: 1:30 pm - 460 DECK INSPECTED ? Yes CRICKETS LN'STALLED? No Location: NA AREA OF ROOF APPLICATION: E-G/J-P/17-22 Number of SQ's (SF X 100) placed this date: 200 SQ Was placement per specifications: Yes OPERATIONS I~NSPECTED: Installation of 1.6" Iso insulation was mechamcally attached to the deck with 2 1/4"fasteners. Fourteen (14) in the corners, twelve (12) at the perimeter (eight feet into the field of the roof) and eight fasteners per 4' X 8' insulation board. Application of the V2" fesco insulation was as required. Staggered over the Iso seams and adhered in a solid mopping of hot asphalt. Cant strips were applied at the perimeter and around curbs, set in hot asphalt. Four (4) plies of Tamko fiberglass felts were applied in a lapping fashion., in a solid mopping of hot asphalt. Application of the base flashing was on-going at area B-P/9 and the expansion joint. The roof was walked and fishmouths and dry. laps were marked for repair. Technician: Carlos Williams Time: 12 to 4pm