Freeport NIP(7.4)-LR000829 TSIT
2502 Gravel Drive - Ft. Worth, TX 76118
817-589-9933
Date: August 29, 2000
Report of Built- Up Roof Inspection
PROJECT: Freeport Building VI
Coppe[l, TX
GENERAL CONTRACTOR: Hill & Wilkenson
800 Klien Rd. Suite 100 - Piano, TX 75074
CONTACT: Mike Worley 214-299-4300 Mob. 214-914-7854
ROOFING CONTRACTOR: Pinkston Ho[lax
2887 A W. Pioneer Pkwy. - Arlington, TX
ROOFING FOREMAN: Scott Lockwood Mob. 817-401-0809
MANUFACTORER: Tamko System - T.vpe III Asphalt - 4 ply with aggregate ballast
Technical Information
WEATHER CONDITIONS: Sunny AaMBIENT TEMPERATURES: 82 to 104
FORECAST FOR NEXT DAY: Same
SIZE OF CREW: 19 TLME: 7 to 4 pm
ROOFING MATERIALS RECEIVED? No LABELS ATTACHED? Yes
M. ATERIALS STORED AS REQUIRED? Yes MATERIALS REJECTED? No
SPECIFIED TEMPERATURES: (Asphalt)
Kettle: 500 + 25 degrees F. EVT (Application): 450 +25 degrees F.
Kettle: 1:00 pm - 500 EVT: 1:30 pm - 460
DECK INSPECTED? Yes
CRICKETS INSTALLED? No Location: NA
AREA OF ROOF APPLICATION: G-J'/17-22
Number of SQ's (SF X 100) placed this date: 100 SQ
Was placement per specificatiom: Yes
OPERATIONS INSPECTED: Installation of 1.6" Iso insulation was mechanically attached
to the deck with 2 V4"fasteners. Fourteen (14) in the corners, twelve (12) at the perimeter
(eight feet into the field of the roof) and eight fasteners per 4' X 8' insulation board.
Application of the 1/2" fesco insulation was as required. Staggered over the Iso seams and
adhered in a solid mopping of hot asphalt. Cant strips were applied at the perimeter and
around curbs, set in hot asphalt.
Four (4) plies of Tamko fiberglass felts were applied in a lapping fashion., in a solid
mopping of hot asphalt.
Flashing detail was performed on the air conditioning penetrations. Mark roof for
corrections, fishmouths and dry. laps.
Technician: Carlos Williams Time: 12 to 4pm