Freeport NIP(2.5)-LR 980715 (2) GEOTECHNICAL AND ~ F~ ~1 II p
ENVIRONMENTAL CONSULTANTS
July 15, 1998
Project No. 4115
Report No. 81
Myers & Crow Company, Ltd.
3811 Turtle Creek Boulevard
Suite 730
Dallas, Texas 75219
ATTN: Mr. Richard Crow
Re: Structural Steel Inspection
Northpoint Distribution Center
Royal Lane at Northpoint Drive
Coppell, Texas
Gentlemen:
Transmitted here are the results of the structural steel inspections performed at the
referenced site for Reed Engineering Group, Inc. on July 1st and July 2, 1998, by Contract
Inspection Service.
Should you have any questions, please do not hesitate to call.
Sincerely,
REED ENGINEERING GROUP, INC.
Original Signed By
Ronald F. Reed, P.E.
KEA/RFR/rls
copies submitted: (4) Myers & Crow Company, Ltd./Mr. Richard Crow
(1) AECC, Inc./Mr. Jimmy Schwartz
(1) Dockcry Engineering/Mr. Bill Wray
(1) McFadden & Miller/Mr. Jori Jacobson
(1) Halff Associates/Mr. Pat Acker
(1) Pritchard Associates/Mr. Jim Pritchard
(1) O'Brien & Associates/Mr. Mick Granlund
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019
CONTRA CT INSPECTION SER VICE, Inc.
4305 Glenwood Ct Granbury, TX 76049 (817) 246-8096 FAX (817) 246-5889
REPORT OF
METAL DECK INSPECTION
Project: North Point Distribution Center Report No: 9803-8
Coppell, TX Attention: Keith Atkins
Client: Reed Engineering Group Date of Service: 07-01-98
2424 Smtz, Suite 400
Dallas, TX 75235 Page I of 1
REPORT OF INSPECTION
Drawings utilized: Contract Documents/AWS D1.1-96
Locations/item inspected: Column line 21 to 17, grid line A to G
Discrepancies/comments:
A visual inspection was conducted on the above reference project with results as follows:
1 .) Metal roof deck was found to comply for:
a.) puddle weld size
b.) side lap screw installation
c.) weld pattern
Tim Glazier CWI #98020281 ~7~tfjo/.~c~ ~ ~f._ ~~
] Co(~tract Inspection Service
Technician
This report is for the exclusive use of our client and shall not be modified or reproduced without written approval from said client
CONTRA CT INSPECTION SER VICE, Inc.
4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 FAX (817) 246-5889
REPORT OF
STRUCTURAL ERECTION INSPECTION
Project: North Point Distribution Center Report No: 9823-8
Coppell, TX Attention: Keith Atkins
Client: Reed Engineering Group Date of Service: 07-02-98
2424 Stutz, Suite 400
Dallas, TX 75235 Page 1 of 1
REPORT OF INSPECTION
Drawings utilized: Contract Documents/AWS D1.1-96/SJI/AISC
Locations/item inspected: Column line 11 to 17, grid line A to G
DiscrepancieS/comments:
'A visual inspection was conducted on the above reference project with results as follows:
1.) Joist girder to tilt panel connections welds and bearing found to comply.
2.) Joist girder to column connections welds and bearing found to comply.
3.) Joist to joist girder welds and bearing found to comply.
4.) Anchor bolts comply for:
a.) nut engagement
b.) tension
5.) Bridging has been installed and found to comply.
Tim Glazier CWI #98020281 /~/T/L~ ~~ ~/ i~-
Technician c/! Cont/ract Inspection Service
This report is for the exclusive use of our client and shall not be modified or reproduced without written approval from said client