Loading...
Freeport NIP(2.5)-LR 980717 Itel~'E~'r-'~ [ I~: r-ll:~ I r"l I~: E~:l=alll--II:~ GEOTECHNICAL AND ~ F~ f'--I I I ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Northpoint Distribution Center Royal Lane at Northpoint Drive Coppell, Texas REPORTED TO: Myers & Crow Company, Ltd. REPORT NO 89 3811 Turtle Creek Boulevard REG PROJECT NO. 4115 Suite 730 SAMPLE DATE: 07-17-98 Dallas, Texas 75219 TECHNICIAN: T. Belew ATTN: Mr. Richard Crow CONTRACTOR: McFadden & Miller Location of Sample 1 Paving: 10'N, 130'E of NW Bldg. Corner 10/10 J Design Information J 1 TXl g843 4000 I Test Results 1 3379 07-24-98 7 83610 2960 3379 07-24-98 7 86240 3050 3010 3379 08-14-98 28 113390 4010 3379 08-14-98 28 114090 4040 4030 Cylinder Data J 1 3379 6.00 85 89 6.0 7:15 AM 1095429 J Distribution: (4) Myers & Crow Company, Ltd./ Submitted by: Mr. Richard Crow (1) AECC, Inc./Mr. Jimmy Schwartz REED ENGINEERING GROUP, INC. (1) Dockery Engineering/Mr. Bill Wray (1) McFadden & Miller/ Original Signed By Mr. Jon Jacobson (1) Pritchard Associates/ Keith E. Atkins Mr. Jim Pritchard KEA/ajw (1) O'Brien & Associates/ Mr. Mick Granlund (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR. · SUITE 400 · DALLAS, TX75235 · TEL[214] 350 5600 · FAX [214] 350 0019