Freeport NIP(2.5)-LR 980915I~1 E l~:: I:~ I l~: rlr'~ I I-'1 I~:l~ I=~llr'll:~
GEOTECHNICAL AND
ENVIR. ON IelENTAL CONSULTANTS
REPORT OF BUILT-UP ROOFING OBSERVATION
Northpoint Distribution Center
Royal Lane at Northpoint Drive
Coppell, Texas
REPORTED TO: Myers & Crow Company, Ltd. REPORT NO. 100
3811 Turtle Creek Boulevard REPORT DATE: 09-15-98
Suite 730 REG PROJECT NO. 4115
Dallas, Texas 75219 DATE OBSERVED: 08-20-98
ATTN: Mr. Richard Crow TECHNICIAN: T. Belew
PAGE: 1 of 1
Ii ,~ McFadden & Miller Cloudy
~:~ vii Wind River Roof 80°/97°
I ~ ~!!!!i;~i~I!!il Roof: line A to D between 21 and 26 and line D to G between
21 and 26.
I~ ' ~:~,~, Application of a flood coat of hot asphalt covered with gravel
ballast. Patch areas marked on 08-18-98.
Gravel 50,000 Sq.ft
Roofing Materials As Specified: X Roof Sketch Attached: X
Labels Attached: X Debris Removed from Roof Surface: X
Material Sheet Attached: X Crickets Installed: X
Materials Stored as Required: X Deck Inspected: X
Non Conforming Materials Noted: X Photograph's taken this Date: X
Pull Test and/or Adhesion Test Performed: X Attachments: X
Asphalt Kettle Temperature: 500° +/- 25 F )lication (EVT): 450° +/- 25 F
Distribution: (4) Myers & Crow Company, Ltd./ Submitted by:
Mr. Richard Crow
(1) AECC, Inc./Mr. Jimmy Schwartz REED ENGINEERING GROUP, INC.
(1) Dockery Engineering/
Mr. Bill Wray Original Signed By
(1) McFadden & Miller/
Mr. Jon Jacobson Keith Atkins
(1) Halff Associates/Mr. Pat Acker
(1) Pritchard Associates/ BW/rls
Mr. Jim Pritchard
(1) O'Brien & Associates/
Mr. Mick Granlund
2424 STUTZ DR.- SUITE400- DALLAS, TX75235 · TEL[214] 350 5600 · FAX[214] 3S0 0019