REPORT OF BUILT-UP ROOFING OBSERVATION
Northpoint Distribution Center
Royal Lane at Northpoint Drive
Coppell, Texas
REPORTED TO: Myers & Crow Company, Ltd. REPORT NO. 101
3811 Turtle Creek Boulevard REPORT DATE: 09-15-98
Suite 730 REG PROJECT NO. 4115
Dallas, Texas 75219 DATE OBSERVED: 08-21-98
ATTN: Mr. Richard Crow TECHNICIAN: T. Belew
PAGE: 1 of 1
Il~ ~ ..w.~.] McFadden & Miller Clear
~1 Wind River Roofing 1~ ~,~J~,~,l 80°/97°
t ~= ~ ~ ] Application of a flood coat of hot asphalt covered with gravel
ballast, application of base flashing, application of Expando Fash
at expansion joint.
~; Gravel: 40,000 Sq.ft
Roofing Materials As Specified: X Roof Sketch Attached: X
Labels Attached: X Debris Removed from Roof Surface: X
Material Sheet Attached: X Crickets Installed: X
Materials Stored as Required: X Deck Inspected: X
Non Conforming Materials Noted: X Photograph's taken this Date: X
Pull Test and/or Adhesion Test Performed: X Attachments: X
Asphalt Kettle Temperature: 500° +/- 25 F (EV'I'): 450° +/- 25 F
Asphalt / Pitch Kettle Temperature: Time Temp. Application {EVT): Time Temp.
Asphalt 9:00am 510o Asphalt 9:15 470°
Distribution: (4) Myers & Crow Company, Ltd./ Submitted by:
Mr. Richard Crow
(1) AECC, Inc./Mr. Jimmy Schwartz REED ENGINEERING GROUP, INC.
(1) Dockery Engineering/
Mr. Bill Wray Original Signed By
(1) McFadden & Miller/
Mr. Jon Jacobson
(1) Halff Associates/Mr. Pat Acker Keith Atkins
(1) Pritchard Associates/ BW/rls
Mr. Jim Pritchard
(1) O'Brien & Associates/
Mr. Mick Granlund
2424 STUTZ DP,. · SUITE400 ·DALLAS, TX75235 · TEL[214] 350 5600 · F^X[214] 350 0019