Loading...
Freeport NIP(2.5)-LR 980915 (2)R E~:I~: l:3 I E~ I--I r~ I I--lIE: E~: RIr"ll:~ GEOTECHNICAL AND [~ F~J r'l I I ~ EN¥1~,ONMENTAL CONSULTANTS REPORT OF BUILT-UP ROOFING OBSERVATION Northpoint Distribution Center Royal Lane at Northpoint Drive Coppell, Texas REPORTED TO: Myers & Crow Company, Ltd. REPORT NO. 101 3811 Turtle Creek Boulevard REPORT DATE: 09-15-98 Suite 730 REG PROJECT NO. 4115 Dallas, Texas 75219 DATE OBSERVED: 08-21-98 ATTN: Mr. Richard Crow TECHNICIAN: T. Belew PAGE: 1 of 1 Il~ ~ ..w.~.] McFadden & Miller Clear ~1 Wind River Roofing 1~ ~,~J~,~,l 80°/97° t ~= ~ ~ ] Application of a flood coat of hot asphalt covered with gravel ballast, application of base flashing, application of Expando Fash at expansion joint. ~; Gravel: 40,000 Sq.ft Roofing Materials As Specified: X Roof Sketch Attached: X Labels Attached: X Debris Removed from Roof Surface: X Material Sheet Attached: X Crickets Installed: X Materials Stored as Required: X Deck Inspected: X Non Conforming Materials Noted: X Photograph's taken this Date: X Pull Test and/or Adhesion Test Performed: X Attachments: X Asphalt Kettle Temperature: 500° +/- 25 F (EV'I'): 450° +/- 25 F Asphalt / Pitch Kettle Temperature: Time Temp. Application {EVT): Time Temp. Asphalt 9:00am 510o Asphalt 9:15 470° Distribution: (4) Myers & Crow Company, Ltd./ Submitted by: Mr. Richard Crow (1) AECC, Inc./Mr. Jimmy Schwartz REED ENGINEERING GROUP, INC. (1) Dockery Engineering/ Mr. Bill Wray Original Signed By (1) McFadden & Miller/ Mr. Jon Jacobson (1) Halff Associates/Mr. Pat Acker Keith Atkins (1) Pritchard Associates/ BW/rls Mr. Jim Pritchard (1) O'Brien & Associates/ Mr. Mick Granlund 2424 STUTZ DP,. · SUITE400 ·DALLAS, TX75235 · TEL[214] 350 5600 · F^X[214] 350 0019