Freeport NIP(2.5)-LR 980923 GEOTECHNICAL AND ~ F~ I'-1
ENVIRON~IENtAi CONSUlTaNTS
REPORT Of BUILT-UP ROOFING OBSERVATION
Northpoint Distribution Center
Royal Lane at Northpoint Drive
Coppell,9 Texas
REPORTED TO: Myers & Crow Company, Ltd. REPORT NO. 102
3811 Turtle Creek Boulevard REPORT DATE: 09-23-98
Suite 730 REG PROJECT NO. 4115
Dallas, Texas 75219 DATE OBSERVED: 08-18-98
ATTN: Mr. Richard Crow TECHNICIAN: T. Belew
PAGE: 1 of 1
CONTRACTOR: McFadden & Miller
~ II McFadden & Miller Partly Cloudy
~ Il Wind River Roofing ] 79°/95°
~ ill li~il Roof: Column Line a to G, between 21 and 26 and line a to G
between 17 and 21.
~, ] Preparation of roof for gravel ballast from A to G between 17 and 21.
Marked fish mouths, dry laps A to G between 21 and 26.
Application of expando flash along expansion joints.
Roofing Materials As Specified: X Roof Sketch Attached: X
Labels Attached: X Debris Removed from Roof Surface: X
Material Sheet Attached: X Crickets Installed: X
Materials Stored as Required: X Deck Inspected: X
Non Conforming Materials Noted: X Photograph's taken this Date: X
Distribution: (4) Myers & Crow Company, Ltd./ Submitted by:
Mr. Richard Crow
(1) AECC, Inc./Mr. Jimmy Schwartz REED ENGINEERING GROUP, INC.
(1) Dockery Engineering/
Mr. Bill Wray Original Signed By
(1) McFadden & Miller/
Mr. Jori Jacobson Keith Atkins
(1) Pritchard Associates/ BW/rls
Mr. Jim Pritchard
(1) O'Brien & Associates/
Mr. Mick Granlund
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019