Loading...
Freeport NIP(2.5)-LR 980923 GEOTECHNICAL AND ~ F~ I'-1 ENVIRON~IENtAi CONSUlTaNTS REPORT Of BUILT-UP ROOFING OBSERVATION Northpoint Distribution Center Royal Lane at Northpoint Drive Coppell,9 Texas REPORTED TO: Myers & Crow Company, Ltd. REPORT NO. 102 3811 Turtle Creek Boulevard REPORT DATE: 09-23-98 Suite 730 REG PROJECT NO. 4115 Dallas, Texas 75219 DATE OBSERVED: 08-18-98 ATTN: Mr. Richard Crow TECHNICIAN: T. Belew PAGE: 1 of 1 CONTRACTOR: McFadden & Miller ~ II McFadden & Miller Partly Cloudy ~ Il Wind River Roofing ] 79°/95° ~ ill li~il Roof: Column Line a to G, between 21 and 26 and line a to G between 17 and 21. ~, ] Preparation of roof for gravel ballast from A to G between 17 and 21. Marked fish mouths, dry laps A to G between 21 and 26. Application of expando flash along expansion joints. Roofing Materials As Specified: X Roof Sketch Attached: X Labels Attached: X Debris Removed from Roof Surface: X Material Sheet Attached: X Crickets Installed: X Materials Stored as Required: X Deck Inspected: X Non Conforming Materials Noted: X Photograph's taken this Date: X Distribution: (4) Myers & Crow Company, Ltd./ Submitted by: Mr. Richard Crow (1) AECC, Inc./Mr. Jimmy Schwartz REED ENGINEERING GROUP, INC. (1) Dockery Engineering/ Mr. Bill Wray Original Signed By (1) McFadden & Miller/ Mr. Jori Jacobson Keith Atkins (1) Pritchard Associates/ BW/rls Mr. Jim Pritchard (1) O'Brien & Associates/ Mr. Mick Granlund 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019