Loading...
Freeport NIP(2.5)-LR 980930 (2)GEOTI.-'CHNICAL AND J~ F:~J C~ I I F~J ENVIRONMENTAL CONSULTANTS REPORT OF BUILT-UP ROOFING OBSERVATION Northpoint Distribution Center Royal Lane at Northpoint Drive Coppell, Texas REPORTED TO: Myers & Crow Company, Ltd. 'REPORT NO. 104 3811 Turtle Creek Boulevard REPORT DATE: 09-30-98 Suite 730 REG PROJECT NO. 4115 Dallas, Texas 75219 DATE OBSERVED: 08-25-98 ATTN: Mr. Richard Crow TECHNICIAN: T. Belew PAGE: I of 1 ~i~ J McFadden & Miller ]Wind River Roofin.cl J J 80°/103° ~] Roof Line A to G from 17 to 21 ~ ~Application of a flood coat of hot asphalt covered with gravel ballast along perimeter of roof and application of metal flashings and termination bar. Roofing Materials As Specified: X Roof Sketch Attached: X Labels Attached: X Debris Removed from Roof Surface: X Material Sheet Attached: X Crickets Installed: X Materials Stored as Required: X Deck Inspected: X Non Conforming Materials Noted: X Photograph's taken this Date: X Pull Test and/or Adhesion Test Performed: X Attachments: 'X IAsphalt Kettle Temperature:I 500° +/- 25 f Iapplication (EVT): I 450o +/- 25 F I Asphalt / Pitch Kettle Temperature:Time Temp. Application (EVT): Time Temp. Asphalt 12:30 pm 500° 12:45 pm 470° Distribution: (4) Myers & Crow Company, Ltd./ Submitted by: Mr. Richard Crow (1) AECC, Inc./Mr. Jimmy Schwartz REED ENGINEERING GROUP, INC. (1) Dockery Engineering/ Mr. Bill Wray Original Signed By (1) McFadden & Miller/ Mr. Jon Jacobson Keith Atkins (1) Halff Associates/Mr. Pat Acker AE/cav (1) Pritchard Associates/ Mr. Jim Pritchard (1) O'Brien & Associates/ Mr. Mick Granlund 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019