Freeport NIP(2.5)-LR 980930 (2)GEOTI.-'CHNICAL AND J~ F:~J C~ I I F~J
ENVIRONMENTAL CONSULTANTS
REPORT OF BUILT-UP ROOFING OBSERVATION
Northpoint Distribution Center
Royal Lane at Northpoint Drive
Coppell, Texas
REPORTED TO: Myers & Crow Company, Ltd. 'REPORT NO. 104
3811 Turtle Creek Boulevard REPORT DATE: 09-30-98
Suite 730 REG PROJECT NO. 4115
Dallas, Texas 75219 DATE OBSERVED: 08-25-98
ATTN: Mr. Richard Crow TECHNICIAN: T. Belew
PAGE: I of 1
~i~ J McFadden & Miller
]Wind River Roofin.cl J J 80°/103°
~] Roof Line A to G from 17 to 21
~ ~Application of a flood coat of hot asphalt covered with gravel ballast
along perimeter of roof and application of metal flashings and
termination bar.
Roofing Materials As Specified: X Roof Sketch Attached: X
Labels Attached: X Debris Removed from Roof Surface: X
Material Sheet Attached: X Crickets Installed: X
Materials Stored as Required: X Deck Inspected: X
Non Conforming Materials Noted: X Photograph's taken this Date: X
Pull Test and/or Adhesion Test Performed: X Attachments: 'X
IAsphalt Kettle Temperature:I 500° +/- 25 f Iapplication (EVT): I 450o +/- 25 F I
Asphalt / Pitch Kettle Temperature:Time Temp. Application (EVT): Time Temp.
Asphalt 12:30 pm 500° 12:45 pm 470°
Distribution: (4) Myers & Crow Company, Ltd./ Submitted by:
Mr. Richard Crow
(1) AECC, Inc./Mr. Jimmy Schwartz REED ENGINEERING GROUP, INC.
(1) Dockery Engineering/
Mr. Bill Wray Original Signed By
(1) McFadden & Miller/
Mr. Jon Jacobson Keith Atkins
(1) Halff Associates/Mr. Pat Acker AE/cav
(1) Pritchard Associates/
Mr. Jim Pritchard
(1) O'Brien & Associates/
Mr. Mick Granlund
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019