Loading...
Freeport NIP(2.5)-LR 980930 (3)HEED I EnGII'-IEEHInG GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT OF BUILT-UP ROOFING OBSERVATION Northpoint Distribution Center Royal Lane at Northpoint Drive Coppell, Texas REPORTED TO: Myers & Crow Company, Ltd. REPORT NO. 105 3811 Turtle Creek Boulevard REPORT DATE: 09-30-98 Suite 730 REG PROJECT NO. 4115 Dallas, Texas 75219 DATE OBSERVED: 08-26-98 ATTN: Mr. Richard Crow TECHNICIAN: T. Belew PAGE: 1 of 1 !~ McFadden & Miller I ~l~ll Pt-Cloudy Wind River Roofin.q ~ I 82°/102° ~i~[l~tl Roof Line A to G from 1 to 26 tl~l Detail work around sky lights, expansion joints, perimeter flashings and areas of roof that were incomplete. Roofing Materials As Specified: X Roof Sketch Attached: X Labels Attached: X Debris Removed from Roof Surface: X Material Sheet Attached: X Crickets Installed: X Materials Stored as Required: X Deck Inspected: X Non Conforming Materials Noted: X Photograph's taken this Date: X Pull Test and/or Adhesion Test Performed: X Attachments: X )halt Kettle Temperature: 500° +/- 25 F )lication (EVT): 450° +/- 25 F Asphalt / Pitch Kettle Temperature: I Time Temp. Application (EVT): Time Temp. ,,..,. Asphalt111:30 am 510° 12:45 pm 475° Distribution: (4) Myers & Crow Company, Ltd./ Submitted by: Mr. Richard Crow (1) AECC, Inc./Mr. Jimmy Schwartz. REED ENGINEERING GROUP, INC. (1) Dockery Engineering/ Mr. Bill Wray Original Signed By (1) McFadden & Miller/ Mr. Jon Jacobson Keith Atkins (1) Halff Associates/Mr. Pat Acker AE/cav (1) Pritchard Associates/ Mr. Jim Pritchard (1) O'Brien & Associates/ Mr. Mick Granlund 2424 STUTZ DR. · SUITE400 · DALLAS, TX75235 · TEL[214] 350 5600 · FAX[214] 350 001c)