Freeport NIP(2.5)-LR 980930 (3)HEED I EnGII'-IEEHInG
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT OF BUILT-UP ROOFING OBSERVATION
Northpoint Distribution Center
Royal Lane at Northpoint Drive
Coppell, Texas
REPORTED TO: Myers & Crow Company, Ltd. REPORT NO. 105
3811 Turtle Creek Boulevard REPORT DATE: 09-30-98
Suite 730 REG PROJECT NO. 4115
Dallas, Texas 75219 DATE OBSERVED: 08-26-98
ATTN: Mr. Richard Crow TECHNICIAN: T. Belew
PAGE: 1 of 1
!~ McFadden & Miller I ~l~ll Pt-Cloudy
Wind River Roofin.q ~ I 82°/102°
~i~[l~tl Roof Line A to G from 1 to 26
tl~l Detail work around sky lights, expansion joints, perimeter flashings and
areas of roof that were incomplete.
Roofing Materials As Specified: X Roof Sketch Attached: X
Labels Attached: X Debris Removed from Roof Surface: X
Material Sheet Attached: X Crickets Installed: X
Materials Stored as Required: X Deck Inspected: X
Non Conforming Materials Noted: X Photograph's taken this Date: X
Pull Test and/or Adhesion Test Performed: X Attachments: X
)halt Kettle Temperature: 500° +/- 25 F )lication (EVT): 450° +/- 25 F
Asphalt / Pitch Kettle Temperature: I Time Temp. Application (EVT): Time Temp.
,,..,. Asphalt111:30 am 510° 12:45 pm 475°
Distribution: (4) Myers & Crow Company, Ltd./ Submitted by:
Mr. Richard Crow
(1) AECC, Inc./Mr. Jimmy Schwartz. REED ENGINEERING GROUP, INC.
(1) Dockery Engineering/
Mr. Bill Wray Original Signed By
(1) McFadden & Miller/
Mr. Jon Jacobson Keith Atkins
(1) Halff Associates/Mr. Pat Acker AE/cav
(1) Pritchard Associates/
Mr. Jim Pritchard
(1) O'Brien & Associates/
Mr. Mick Granlund
2424 STUTZ DR. · SUITE400 · DALLAS, TX75235 · TEL[214] 350 5600 · FAX[214] 350 001c)