Freeport NIP(7.4)-LR000914 CONTRA CT INSPECTION SER VICE, Inc.
4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 FAX (817) 246-5889
REPORT OF
STRUCTURAL ERECTION INSPECTION
Project: Freeport VI Report No: 18854-0
Coppell, Texas Attention: Keith Atkins
Client: Reed Engineering Group Date of Service: 09-14-00
2424 Stutz, Suite 400
Dallas, TX 75235 Page 1 of 1
REPORT OF INSPECTION
Drawings uffiized: Contract Documents
Locations/item inspected: Grid line A - P, column 1 - 22
Discrepancies/comments:
1.) Midspan bracing was found to be installed and welded as detailed.
2.) Joist girders to column connections (detail S5.1/04), bottom chords were found to be welded
as detailed.
3.) Joist girders to panel connections (detail S5.1/08), stabilizer plates have been installed and
welded as detailed. Bottom chords are not welded to plates which complies to detail.
Cecil R. McKinney, Jr., CWI #99121311 ~ontr~-~- ~.~
Technician act Inspection Service
This report is for the exclusive use of our client and shall not be modified or reproduced without written approval from said client