Loading...
Freeport NIP(7.4)-LR000914 CONTRA CT INSPECTION SER VICE, Inc. 4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 FAX (817) 246-5889 REPORT OF STRUCTURAL ERECTION INSPECTION Project: Freeport VI Report No: 18854-0 Coppell, Texas Attention: Keith Atkins Client: Reed Engineering Group Date of Service: 09-14-00 2424 Stutz, Suite 400 Dallas, TX 75235 Page 1 of 1 REPORT OF INSPECTION Drawings uffiized: Contract Documents Locations/item inspected: Grid line A - P, column 1 - 22 Discrepancies/comments: 1.) Midspan bracing was found to be installed and welded as detailed. 2.) Joist girders to column connections (detail S5.1/04), bottom chords were found to be welded as detailed. 3.) Joist girders to panel connections (detail S5.1/08), stabilizer plates have been installed and welded as detailed. Bottom chords are not welded to plates which complies to detail. Cecil R. McKinney, Jr., CWI #99121311 ~ontr~-~- ~.~ Technician act Inspection Service This report is for the exclusive use of our client and shall not be modified or reproduced without written approval from said client