Gateway BP(1.2)-CS 970317 COPPELL ENGINEERING
UTILITIE$ DIVISION
MEMORANDUM
DATE: 3/17/97
TO: Larry Davis, Construction Inspector
FROM: Larry Smith, Utilities
RE: Walk thru for
A walk-thru on the above referenced project was conducted on
and the items below were found to be deficient.
1.
Fritz/Gatewa Business Park
3117197
R~air Bilcolid on domestic meter vault on Gateway will not open fully.
m
o
10.
Please ensure that these items get taken care of and if you have any questions, please
give me a call.
MMC/dg