Loading...
Gateway BP(1.2)-CS 970317 COPPELL ENGINEERING UTILITIE$ DIVISION MEMORANDUM DATE: 3/17/97 TO: Larry Davis, Construction Inspector FROM: Larry Smith, Utilities RE: Walk thru for A walk-thru on the above referenced project was conducted on and the items below were found to be deficient. 1. Fritz/Gatewa Business Park 3117197 R~air Bilcolid on domestic meter vault on Gateway will not open fully. m o 10. Please ensure that these items get taken care of and if you have any questions, please give me a call. MMC/dg