Loading...
Gateway BP(1.2)-CS 970122To: From: RE: Date: Jennifer Armstrong, Finance Director Kenneth M. Griffin, P.E., Dir. of Engineering & Public Works Gateway Business Park Lot 1, Block I (Fritz) January 22, 1997 This memo is written as a follow-up to our meeting this morning concerning reimbursement of some of the construction inspection fees paid for the Fritz development in Coppeil. Based on the ordinance in place at the time, the Engineering Department assessed a 4% Construction Inspection Fee on the public portion of the Fritz development. This resulted in a payment of $4,765.74. However, during the negotiation process for Fritz locating in Coppell it was agreed that the inspection fee for the project would be assessed entirely at 2%, not 4% for public and 2% for private. Therefore, the Construction Inspection Fee for the public portion of the project should have been $2,382.36. A check in the amount of $2,383.38 should be processed to the Catellus Development Corporation. I apologize for any inconvenience this may cause, however, I do appreciate your corporation in expeditiously processing this refund. If you have any questions please feel free to contact me at your convenience. DEVELOPMENT FEES IPROJECT NAME: Gateway Business Park, Lot 1, Block 1 (Fritz Warehouse) ENGINEER: Brocketter, Davis, and Drake REVISION DATE: 6/20/96 SENT ASSESSMENT ASSESSED FEE Park Fee 4/19/96 Water Impact Fee $19,125.00 4/19/96 Wastewater Impact Fee $10,800.00 4/19/96 Street Sign Street Light Const. Inspection {Public) Const. Inspection (Private) Irrigation Street Escrow Street Cut Permit Overtime Inspection Water Tap Inspection Sewer Tap Inspection Utility Final Inspection Water Meter (Domestic) Water Meter Deposit Water Meter (Fire & Irrig.) Irrigation Meter Deposit TOTALS $4,765.74 $15,425.24 $53,898.14 $100.00 $350.00 $200.00 $50.00 $1,637.94 $150.00 $ 9,190.98 $70.00 Total Fees $115,763.04 AMOUNT PAID $19,125.00 $1 O, 800.00 notify street dept. $4,765.74 $15,425.24 $53,898.14 $100.00 $350.00 $200.00 $50.00 $1,637.94 $150.00 $9,190.98 $70.00 Fees Paid $115,763.04 DATE 5/10/96 - 5~23/96 5/1 O/96 5/10/96 5/23/96 6/5/96 5/10/96 ' 5/10/96 - 6/20/96 5/10/96- 6/20/96 6/20/96 Amount Owed $0.O0 NOTES 5/13/96 4/25/96 Prior To Construction Erosion Control Approved (w/grading plans) E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Maint. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint. pared by_ roved by FUND: CITY OF COPPELL JOURNAL ENTRY DESCRIPTION ACCOUNT NUMBER TOTAL J.E. NO._c-'~/(,~/-- POSTED BY: DATE: DR. ~ cj \~.%.oa · '-/I 5'-75. 9,2.. CR. J-.J / ~7 ..,>..? z ,,~TE IN VOICE/CR.E DIT MEMO ~ DESCRIPTION GROSS DISCOUNT N'ET ~.}1/~2/~6 PERMIT FEESFRiTz PROJECT I , $41,5/3.9'2 / / i I I I I I I I I I I I I I I I I I I I I I I I ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I · r.~ ,,.,..=.,o,=.,=,, ., .. .... ,.,',o,,.'r,,,~oE,,'...,o,,.ov,. III[I]IIEII~'~ ~ I $41,573. 2 CATELLUS DEVELOPMENT CORPORATION [] .s2.3s3,, 1065 N. PACIFICENTER DRIVE. SUITE 200 ANAHEIM, CALIFORNIA 92806 CHECK NO. PAY FORTY ONE THOUSAND FIVE HUNDRED SEVENTY THREE AND 92/1OO***** ~01G89 TO THE ORDER OF DATE CHECK AMOUNT THE CITY OF COPPELL 04/22/96 $41,573.92 ORAWN ON BANKERS TRUST [DELAWARE) WILMINGTON. OELAWAR E IN COOPERATION WITH SECURITY PACIFIC NATIONAL BANK ,'qOJr:Bq,' ~:03:l, O0:JBO,: DO Sq :~q 50,'