Loading...
Freeport NIP(7.4)-LR000913 (4) GEOTECHNICAL AND ~ I~ F~I I"-I U F~ ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Freeport VI Royal Lane and Creekview Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 107 5495 Beltline Road, Suite 360 REPORT DATE: 09-13-00 Dallas, Texas 75240 REG PROJECT NO. 6542 ATTN: Mr. Paul Brown DATE OBSERVED: 08-30-00 TECHNICIAN: H. Johnson PAGE: 1 of 1 CONTRACTOR: Hill & Wilkinson, Inc. I Items Observed: I East side employee parking and front: 0-341'S, 0-90'E of the N.E. building corner. I Reference Plans or Notes Used: I Sheet S-6.0 I x JThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) Duke-Weeks Realty Corporation/ Submitted by: Mr. Paul Brown (1) Hardy McCullah/MLM Architects/ REED ENGINEERING GROUP, INC. Mr. Norman Coates (1) TMBP - Consulting Engineers/ Original Signed By Mr. Frank Merritt (1) Pacheco Koch/Mr. Jim Koch James F. Phipps, P.E. (1) Hill & Wilkinson, Inc./ KA/je Mr. Steve Camp (1) City of Coppell/Mr. Lee Stone or Mr. Larry Davis 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 REPORT NO. 100 REPORT DATE: 09-01-00 REG PROJECT NO. 6542 PAGE: 2 of 2 Depth Below Field Field Test Final S. G. Density Moisture Proctor Compaction No. Date Location (feet) (pcf) (%) ID Level (%) 606 08-25-00 Leaveout: 355'S,225'W(1) 0.0 92.7 25.3 2 98.6 607 Leaveout: 355'S,275'W(1 ) 0.0 94.5 25.1 1 96.1 608 Leaveout: 355'S,300'W(1 ) 0.0 101.7 19.7 6 95.4 609 Leaveout: 355'S,350'W(1 ) 0.0 99.2 20.9 10 95.8 610 Leaveout: 355'S,400'W(1 ) 0.0 93.9 24.7 1 95.8 611 Leaveout: 355'S,450'W(1 ) 0.0 99.9 22.3 4 98.4 612 08-28-00 Leaveout: 335'S,550'W(1) 1.0 103.4 17.4 6 97.0 613 Leaveout: 335'S,600'W(1) 1.0 104.2 17.1 6 97.8 614 Leaveout: 335'S,650'W(1 ) 1.5 94.1 21.6 3 95.0 615 Leaveout: 300'S,687'W(1 ) 0.0 102.2 17.9 6 95.9 616 Leaveout: 250'S,687'W(1 ) 0.0 101.2 18.8 6 95.0 617 Leaveout: 200'S,687'W(1 ) 0.0 98.7 17.8 9 95.3 618 Leaveout: 10'S,677'W (1) 0.0 92.1 25.2 2 97.9 619 Leaveout: 20'S,685'W(1 ) 0.0 90.6 26.8 2 96.3 620 Leaveout: 70'S,687'W(1 ) 0.0 96.0 22.4 3 96.9 621 Leaveout: 120'S,687'W(1) 0.0 101.6 19.3 10 97.5 622 Leaveout: 170'S,687'W(1 ) 0.0 100.3 22.8 4 98.8 623 Leaveout: 335'S,520'W(1 ) 0.0 101.5 20.2 11 96.2 624 Leaveout: 335'S,630'W(1 ) 0.0 94.7 24.4 3 95.6 625 Leaveout: 335'S,680'W(1) 0.0 97.0 22.9 4 95.5 Comments: Where tested, materials were in compliance with project specifications. Footnote: (1) Measurements referenced from N.E. building corner. Distribution: (1) Duke-Weeks Realty Corporation/ Submitted by: Mr. Paul Brown (1) Hardy McCullah/MLM Architects/ REED ENGINEERING GROUP, INC. Mr. Norman Coates (1) TMBP - Consulting Engineers/ Original Signed By Mr. Frank Merritt (1) Pacheco Koch/Mr. Jim Koch Ronald F. Reed, P.E. (1) Hill & Wilkinson, Inc./Mr. Steve Camp KA/mm (1) City of Coppell/Mr. Lee Stone or Mr. Larry Davis