Loading...
Gateway BP(1.2)-CS 960419The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 April 19, 1996 Scott McCrary Gromatzky Dupree & Associates 2626 Cole Avenue, Suite 100 LB Box 48 Dallas, Texas 75204 RE: Gateway Business Park, Replat of Block 1 (Fritz) Development Fee Assessment Dear Mr. McCrary: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee calculations for Gateway Business Park Replat of Block 1 (Fritz). Please make payment to the City of Coppell in the amount of $83,823.14 and forward it to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with 3/ou on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Ted Dutt, Interim Utilities Superintendent Greg Jones, Chief Building Official Per Birdsall, Street Division Rick Wieland, Parks Development Coordinator CITY OF COPPELL DEVELOPMENT FEES Date: Project: April 19, 1996 Fritz (Gateway) TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $19,125.00 $19,125.00 (100% due prior to Council Approval) Water Tap Inspection Fee 350.00 -0- (100% due at Issuance of Water Meter) Wastewater Impact Fee 10,800.00 10,800.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 200.00 -0- (100% due at Issuance of Building Permi0 Utility Final Inspection Fee 50.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 1,637.94 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residemial) 150.00 -0- (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) 9,190.98 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit 70.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -O- (100% due prior to Acceptance of Project) available Park Fee -0- -0- Street Escrow 53,898.14 53,898.14 (100% due prior to Council Approval) Construction Inspection Fee need submittal of -0- (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $ 95,472.06 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 83,823.14 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPRnn ENGINEERING HE~ORANDUM DATE TO: FROM RE: April 12, 1996 Mike Martin, Assistant City Engineer Ted Dutt, Interim Utilities Superintendent Development Fees for Fritz (Gateway) REVISED The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 2 3 - (!} 2" (1~ 3" Domestic Meter/s - 2" Irrigation Meter/s = - (2; 8" {1; 10" Fireline Meter/s Total = 24 ESU's ~6 ESU's = 2.5 ESU's 42.5 ESU'S @ $450.00 ea = $19.I25.00 100% due prior to Council approval of the final plat. Wastewater Impact 2 - (1; 2" (1} 3" Domestic Meter/s = 24 ESU's Total 24 ESU's @ $450.00 ea = $10,800.00 100% due prior to Council approval of the final plat. Water Tap Inspe~ion Fee 7 Connections @ $50.~0 each = $350.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 4 Connections @ $50.00 each ~ $. 200.00 100% due prior to issuance of building permit. (Residential only) (RE-INSPECTIONFOR WATER OR WAST~WATER $30.00) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots @ $ 5O.OO/lot = $50.00 100% due prior to issuance of building permit. Water Weter Fee (Domestic) 1 - 3" 1 - 2" Domestic Meters ~ $~ · 050.00 = $1,050.00 Domestic Meters ~ S195.98 = $587.94 Total $ 1o637.94 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee 2 - 2" ~ - 8" 1 - 10" (Irrigation/Fireline) Irrigation Meter/s ~ $195.98 ea = $ 391.96 Fireline Meter/s @ $ 2,580.90ea = $5,161.80 Fireline Meters/s @ $3,6~7.20ea = $3.637.20 Total $9,190.98 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential) 5 Meters ~ $30.00 ea = $450.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 2 Meters ~ $35.00 ea = $70.00 100% due prior to issuance of water meters. fritz2 ESCROV~ ROADWAY IMPACT FEE CA_ £ULATIONS PROJECT: DATE: Gateway Business Park, Replat of Block 1 (Fritz) 4112/96 ROADWAY IMPACT FEE: Service Area * 9 Ca.gory ** Industrial Land Usc ** Suildin~ Size (ScI. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) General Li~ht Indus~al 169,491 169.491 $3O0 $53,898.14 * (Figure 2- Roadway Impact Fee Smd./) ** (Table 3 - Roadway Impact Fee Study)