Gateway BP(1.2)-CS 960412Date: April 12, 1996
Project: Fritz (Gateway)
CITY OF COPPELL
DEVELOPMENT FEES
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $19,125.00 $19,125.00
(100% due prior to Council Approval)
Water Tap Inspection Fee 350.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee 10,800.00 10,800.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee 200.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee 50.00
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) 1,637.94
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-Residential) 150.00
(100% due at Issuance of Water Meter
Water Meter Fee (Irrigation & Fire) 9,190.98
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit 70.00
(100% due at Issuance of Water Meters)
Street Sign Fee
(100% due prior to Acceptance of Project)
Street Light Fee * information not
(100% due prior to Acceptance of Project) available
Park Fee
(50% due prior to Council Approval)
(50% due prior to Issuance of Building Permit)
Street Escrow
(100% due prior to Council Approval)
Construction Inspection Fee need submittal of
(2% of Project Cost due prior to Preconstr. Mtg.) contracts
TOTAL $41,573.92 $29,925.00
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
COPPELL ENGINEERING
ME~fORANDU~4
DATE:
TO:
FRO~f :
RE:
April 12, 1996
Mike Martin, Assistant city Engineer
Ted Dutt, Interim Utilities Superintendent
Development Fees for Fritz (Gateway) REVISED
The following fees should be assessed and collected on
referenced project.
Water Impact Fee:
1
2
3
- (1; 2" (1) 3" Domestic Meter/s
- 2" Irrigation Meter/s =
- (2) 8" (1) 10" Fireline Meter/s
Total
= 24 ESU's
16 ESU's
= 2.5 ESU's
42.5 ESU's @ $450.00 ea = $19,125.00
100% due prior to Council approval of the final plat.
the above
Wastewater Impact
2 - (1; 2" (1~ 3" Domestic Meter/s = 24 ESU's
Total 24 ESU's @ $450.00 ea = $10,800.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
7 Connections @ $50.00 each = $350.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
4 Connections @ $50.00 each = $. 200.00
100% due prior to issuance of building permit.
(RE-INSPECTION FOR WATER OR WAST~ATER $30.00)
(Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (All Development)
1 lots @ $ 50.O0/lot = $50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - 3" Domestic Meters
1 - 2"
$1,050.00 = $1,050.00
Domestic Meters @ $195.98 = $587.94
Total $ 1,637.94
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee
2 - 2"
2 - 8"
1 - 10"
(Irrigation/Fireline)
Irrigation Meter/s @ $195.98 ea = $ 391.96
Fireline Meter/s @ $ 2,580.90ea = $5,161.80
Fireline Meters/s @ $3,637.20ea = $3,637.20
Total $9,190.98
100% due prior to issuance of water meter/s.
Water Meter Deposit (Multi-Family or Non-Residential)
5 Meters ~ $30.00 ea = $150.00
100% due prior to issuance of water meters.
Irrigation Meter Deposit
2 Meters @ $35.00 ea = $70.00
100% due prior to issuance of water meters.