Gateway BP(1.2)-CS 960229DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: C,,~_ewav_ B~ess Park, Replat of Block 1 (Fri~ Companies. Inc.).
to create two new lots that will allow the development of a 307, 872
square foot office warehouse distribution facili~ and a 169,~??.
square foot office warehouse building, located on the southwest
comer of Freeport Pkwy. and Gateway Blvd., at the request of
Brockette/lhtvis/Drake, Inc.
DRC DATE: February 29, 1996 and March 7, 1996
CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer
004-3679)
COMMENT STATUS: .~'o ~'z .,,~,,.,.~,... tattnt A .....~ o v ,/'FINAL ~
Replat Comments
1. Show the zoning of adjacent properties.
2. Impact fees required.
Block 1, Lot 1
Preliminary Site Plan
1. The intersection of Cotton road and Gateway Blvd. is a 3 leg intersection and not a 4
leg intersection as shown on Sheet L1.01 and Al.01.,
2. Impact fees are required to be paid prior to final plat approval.
3. You should begin your driveway radius 20' from the inlet box.
4. Provide water and sanitary sewer plans.
5. Show the curb return radius. A larger radius should be provided for the truck court
areas.
6. Show driveway widths.
7. Label fire lanes.
Landscape/Irrigation Plan
1. Landscaping and irrigations plans should show the correct driveway layout at the
northeast corner of the development.
Block 1, Lot 2
Preliminary Site Plan
1. You should begin your driveway radius 20' from the inlet box.
2. Provide water and sanitary sewer plans.