Gateway BP(1.2)-CS 960206-",RCHI'rECTURE pi_AN f, lll~lG; II GROMATZKY DUPREE and ASSOCIATES FEB - 5 19°43 Location: MEETING MINUTES FRITZ/CATELLUS BUILD TO SU January 31, 1996 GDA Project No. 96010 City of Coppell Purpose: Attending: This meeting was held to discuss the project requirements for platting, plan submittals and Walter Fuller, Abbott Development Gary Sieb, City of Coppell Jim Patterson, Gromatzky Dupree and Associates Kathy Rabuse, Gromatzky Dupree and Associates Scott McCrary, Gromatzky Dupree and Associates Items discussed were as follows: Platting will be required for both Fritz building and spec building. BDD to investigate if this can be a "replat" of existing block. Submittal of Preliminary Plat, Preliminary Site Plan, and Preliminary Landscap. e Plan will be required for gradin~ permit to be issued ..... Next submittal date for Preliminary Plat is February 2.1 and it is very important to make this date (see schedule). Missing this submittal will cost 30 days out of schedule. Preliminary Plat will be reviewed by Planning and Zoning on third Thursday. Next meeting is March 21. 5. Final Plat will be reviewed at City Council meeting on April 9th. Gary Sieb did offer a path which would allow an accelerated permitting schedule. Gary also stated the City would be able to review drawings within five (5) working days. ao Preliminary Plat, Site Plan and landscape submitted by February 21st. With approved grading, drainage and erosion Meeting Minutes January 31, 1996 Page -2- control plans, ~//~'~ading permit can be issued and site work can commence. b. City staff reviews Preliminary Plat March 1, and meets with GDA and civil on March 7. If plat has only minor comments, the Citywill release a foundation permit for piers, and floor slab. Allowing for a one week bid time, foundation construction can commence March 1 5. c. 7. Other ao If Planning and Zoning approves Preliminary Plat, Site and landscape at meeting on March 21, and recommends approval by City Council then Building Inspection can issue shell building permit. Please note the City will require "hold harmless" agreement with the Owner to indemnify the City from liability until final plat has been approved by City Council on April 9. issues to be concerned with include variances to be requested: Owner will provide a 5' sidewalk easement. Side~valk to be constructed in the future as determined by City Engineer and paid for by Owner. Variance to provide earthen berm and landscaping in lieu of screen wall at truck docks. Variance on the number of parking spaces to be provided, based upon actual employee count and not on square footage. Variance board is administered by Greg Jones, Chief Building Official (214/304-3506) and meets on first Thursday of each month. Requests must be submitted 30 days prior to hearing. Next submittal date is February 7 for meeting on March 7. Based upon accelerated City review GDA has established the following schedule for the fastest possible approval and commencement dates. February 7 · Site plan layout approval by Fritz, Catellus, Abbott, Gensler, BDD and GDA. . ..,~ · Submit site grading and drainage plans~[~'(;'City of Coppell for review and comments. February 14 Page -3- Submit plans for construction of drainage area for review and comment to City of Coppell. Issue plans for earthwork bids and storm drainage bids. February21 · Submit Preliminary Plat, Preliminary Site and Preliminary Landscape Plans. ~ rI~ March 7 · March 8 · March 15 · March 21 · March 22 · · March 29 · With City comments, addressed, submit grading, drainage and erosion control plans and get release' for grading permit. ward earthwork and drainage construction contract and commence site work. Receive City comments on Preliminary Plat, Site and Landscape Plan. Revise and resubmit Final Plat. Submit plans to City for Foundation permit. Issue construction plans for bids on foundation and floor slab package contract. Receive City comments on foundation package. Award contract for foundation and floor slab construction and commence construction. Planning and Zoning review and approve preliminary plat and recommend approval by City council. Submit plans for shell building review by City. Issue shell building plans for bids. Receive City comments for shell building and receive Building Permit. Award contract for shell building and commence construction. ,',-'~. ~' ~ '";' - ' Meeting Minutes January 31, 1996 Page -4- 10. 11. Please note this is the best possible schedule to accelerate construction. Anticipating a six month construction time schedule would be: April 1 · Mobilize on site October15 · Allowing for 10 days delay due to weather. Substantial completion for entire project. November 1 · Punch list complete and tenant move-in started. Meeting was concluded and a brief discussion was held with Jeff Jones at the Fire Marshal's office. Discussion was directed to location of fire lanes, and plans to be required for fire hydrants and water lines. Jeff mentioned providing a water line parallel to the drainage easement with fire hydrants serving both buildings. 12. Meeting was adjourned for a brief review of the site and existing conditions. The above constitutes GDA's understanding of the topics discussed. If there are any discrepancies or clarifications required, please contact the unders~ned. ~ Sc6tt Mc-C~ar~,/'Architect~.__~ / Gromatzky Dupree and~f~s /lb CC: All Attendees Steve Bryant, Catellus Frank Abbott, Abbott Development Jim Riley, BDD Civil Robert Hill, BDD Structural Bob Dupree, GDA Charles Gromatzky, GDA Jeff Smith, GDA File