Loading...
Gateway BP(1.3)-CS000223P.O, Box 478 Coppell, Texas 75019 972-462-0022 February 23, 2000 Kathy Treat Catellus Development Corporation 4545 Fuller Drive, Suite 100 Irving, Texas 75038 Re: Revised Impact fees for Gateway Business Park Block 1, Lot 2 and Common Area 1 (Docucorp) Dear Ms. Treat: In December, 1998 the City of Coppell assessed impact fees for the referenced project. At that time, the City based impact fees assessed on a General Light Industrial use. The roadway impact fee assessed for the entire project (150,017 square feet) was $11,926.35, including a 75 % credit. This fee was paid per the requirements of the Subdivision Ordinance. It has recently come to our attention that 28,570 square feet will be finished out for Dococorp, with 8,895 square feet being office use. As a result, the impact fee for this portion of the development needs to be revised to reflect the change in use. The difference in impact fees required have been calculated as the difference in 8,895 square feet as light industrial and 8,895 square feet as general office. These calculations are provided in the attached Roadway Impact Fee Calculations worksheet and simplified below. $2661.83 (General Office) - $707.15 (Light Industrial) = $1954.68 (Required) Please make payment to the City of Coppell in this amount and forward to the Finance Department along with a copy of the attached fee assessment table. If you have any questions, please contact me at (972)304-7019. Sincerely, Kent M. Collins, P.E. Civil Engineer CC: Jennifer Armstrong, Finance Director Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services Debi Ingram, Engineering Secretary PROJECT: DATE: ROADWAY IMPACT FEE CALCULATIONS Cato/ay Busineu Park Bloelt I, Lot 2 and Common Area 1 02/'25/2000 ROADWAY IMPACT FEE: Offlc~ Service Area * Category ** Land Use ** Building...._.__~ (st) D~elop~ Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Uhi0 x (Fee per Vehicle Mile) -- $10,647.32: * (Figure 2 - m~adway Impact.Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Percent of Credit Toward Roadway Impact Fees 75 % Total Credit $7,985.49 PROJECT: DATE: Gateway Business Park Block 1, Lot 2 and Common Area I 02/23/00 ROADWAY IMPACT FEE: l.it, ht lnduatrlal U~e IService Area Category ** Land Use ** 9 G~neral Li~ ~ (vO~.way Impact Fee due = (Development Units)X' cie Miles per Development Unit) x (Fee per Vehicle Mile) = $2,828.61 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway hnpact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Percent of Credit Toward Roadway Impact Fees 75% Total Credit $2,121.46