Gateway BP(1.1)-AG 900612 AGENDA REQUEST FORM
co c ,.
IT~ ~TION: ~~ ~ of a f~ p~t f~ ~teway ~~ ~ ~t~ at
m~ of ~ P~way ~ ~tt~ R~ at ~ ~ of ~. ~t Ac~, of
~gUATION 0F IT~:
Date of ~-~ ~ ~ ~m~ M~: ~y 17, 1~9
~~ of ~nE ~ ~ ~omm~ A~~ (~) ~ ~ f~.~~ 1) ~t ~ o~ m~ ~ tem~ ~e ~m~t, ~
~ ~ ~~v~, ~ ~ Ci~ ~ f~ a ~~ ~ ~em~ ~m~t, ~ ~5 ~ d~
M~ ~ ~~ of ~c W~ to d~ ~ ,~.mt f~ ~ ~
A~t ~ ~ ~~ of a ~ p~t ~ ~ ~~ ~ ~t~ ~ow ~ ~ ~e
fa~ of ~ fin~! p~t:
1) ~ ~.na~ of ~wa~ ~ ~ ~p~t~ ~ ~ ~~ ~ m ~~
3) ~~ F,~t ~way k a ~ ~ ~.~ ~ ~ ~tt~
w~ ~t~f-way ~~ of ~ ~ ~~ ~~ ~~
4) te~ ~ to ~ ~ ~ ~ ~ ~1 ~ ~~e ~v~ ~ ~ck
fa~ m h~w~ ~n~l to ~ ~~ ~ ~em ~ ~~ ~ m
5) ~w~~,~f~t~-~m~L . .
~~ ~ "' /- .. . . .
/ / ' ' ' -' - ~' ." ' ".~'"~,': ~.. '? . ~*~;:.,.. ' : -'~' ' -" 2': "'
~. / [/ ~ i .... ' :' " " ~' '~;~'~" ' .~:~-':~¢'~>~-'-'=':-~
Acta ~ ~ F/~ ~ '- ,- /~l'~' f l ' -' : .:-.'.-"~'..-.'.. -' '.~
ORAFT
Rick Sheldon of Hughes-Sheldon was present to represent this
before the Commission.
Chairman Munsch opened the public hearing and asked for persons
wishing to speak in opposition to this request. There were
none. He then asked for persons wishing to speak in favor of
the request. Again there were none. The public hearing was
then declared closed.
Following discussion Commissioner Gross moved to approve Case
#PD-112, with the inclusion that there be no front fences
allowed and that the words private streets be stricken from
i(A). Commissioner Redford seconded the motion; motion carried
(4-1) with Chairman Munsch and Commissioners Green, Gross and
Redford voting in favor of the motion, and Commissioner Tunnell
voting against the motion.
PLATTING
Item 6: Consider approval of a request to vacate the previously filed
final plat for Channel Pointe Addition, and approval of a final
plat resubmittal for same, located at the southwest corner of
MacArthur Boulevard and Parkway Boulevard, at the request of Mr.
Rick Sheldon.
P&Z Coordinator Taryon Bowman introduced the item to the
Commission. Ms. Bowman stated this request is located on a 8.98
acre tract of land. The applicant is requesting approval to
vacate the previously filed final plat and approval of the
resubmittal. She stated that all infrastructure is in place and
development fees have been paid.
Rick Sheldon of Hughes Sheldon was present to represent this
item before the Commission.
Following discussion Commissioner Gross moved to approve the
vacating of the previously filed plat and approval of the
resubmittal with the inclusion that there be no front fences
allowed and that the words private streets be stricken from
I(A). Commissioner Redford seconded the motion; motion carried
(4-1) with Chairman Munsch and Commissioners Green, Gross,
Redford voting in favor of the motion, and Commissioner Tunnel
voting against the motion.
Item 7: Consider approval of a final plat for Gateway Business Park,
located at the northwest corner of Freeport Parkway and Cotton
Road, at the request of Mr. Pat Acker, Albert Halff and
Associates, Inc.
P&Z Coordinator Taryon Bowman introduced the item to the
Commission. Ms. Bowman stated that Gateway Business Park is
:rf,.. DRAFT
situated on 103.82 acres of land. The preliminary plat was
approved by City Council on April 10, 1990. The applicant is
requesting approval of the final plat, along with the following
deviations to the Subdivision Ordinance:
1) that the landscaping of parkways shall be completed as the
individual lots are developed,
2) all applicable fees shall be paid by the lot owners as the
individual lots are developed,
3) although Freeport Parkway is a secondary image-zone, no
trees will be permitted along the west right-of-way because
of the existing overhead electrical transmission line,
4) that the temporary drainage to be carried by grass lined
channel without concrete invert or brick facing on
headwalls, channel to be enclosed pipe system as individual
lots are developed, and
5) no sidewalks shall be required for this development.
Ms. Bowman then stated that staff reconmends that the applicant
submit a hold-harmless and indemnity agreement, which would
release the City of Coppell from any liability and indemnities
from problems resulting in damages to the channel.
Mr. Pat Acker of Albert Halff and Associates was present to
represent this item before the Commission.
Following discussion Commissioner Redford moved to approve the
final plat for Gateway Business Park with the following
conditions:
1) that the owners maintain the temporary drainage easement,
2) with regard to the deviations, #1 and #2 be approved, #3 be
disapproved, and instead require shrubs, #4 be disapproved,
and the City ask for a hold-harmless and indemnity
agreement, and #5 be denied, with the Director of Public
Works to decide the requirement for and the timing of
the ~4ewalk.~
Commissioner Gross seconded the motion; motion carried (5-0)
with Chairman Munsch and Commissioners Green, Gross, Redford,
and Tunnell voting in favor of the motion.
Item 8: Consider approval of revision to the West Side Thoroughfare
Plan.
Director of Planning Gary Sieb introduced the item to the
Commission. Mr. Sieb stated that quite some time ago there was
concern expressed over the potential rapid growth of the area
west of Denton Tap Road, and whether the thoroughfare plan would
be able to accommodate the growth explosion in the area. At
that time funds were allocated to hire Barton-Aschman and
Associates to look at the configuration of the thoroughfare plan
from Denton Tap west, and to offer some suggestions and
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
GATEWAY BUSINESS PARK - FINAL PLAT
P & Z HEARING DATE: May 17, 1990
C. C. HEARING DATE: June 12, 1990
LOCATION: Northwest corner of Freeport Parkway and Cotton Road.
SIZE OF AREA: 103.82 acres
REQUEST: Approval of a final plat along with the following
deviations from the Comprehensive Subdivision Ordinance:
1) the landscaping of parkways shall be completed as the
individual lots are developed,
2) all applicable fees shall be paid by the lot owners as
the individual lots are developed,
3) although Freeport Parkway is a secondary image-zone,
no trees will be permitted along the west right-of-way
because of the existing overhead electrical
transmission line,
4) temporary drainage to be carried by grass lined
channel without concrete invert or brick facing on
headwalls, channel to be enclosed pipe system as
individual lots are developed, and
5) no sidewalks shall be required for this development.
APPLICANT: Santa Fe Pacific Realty Corporation
Represented by Pat Acker of Albert Halff & Associates
5429 LBJ Freeway, Suite 600
Dallas, Texas 75240-2609
HISTORY: The preliminary plat for Gateway Business Park was
approved by City Council on April 10, 1990.
TRANSPORTATION:
During the April 10, 1990, City Council meetinG, Santa Fe
Pacific Realty (applicant) requested approval of a
thoroughfare amendment to the Master Plan.
The first amendment was for the realignment of Cotton Road,
and the elimination of Southwestern Boulevard extension.
ITEM 7
Another amendment was to reduce the right-of-way along
Beltline Road from 6-lane divided to a 4-lane divided
roadway from Denton Tap to Freeport Parkway; and a 4-lane
undivided roadway from Freeport to Royal Lane. City
Council approved this request along with the condition that
the entrances at Gateway Boulevard, as well as the
intersection of Gateway and Royal include a divided median
for at least 125 feet with the median being heavily
landscaped.
ANALYSIS: The applicant is requesting approval of a final plat and
deviations from the Comprehensive Subdivision Ordinance as
outlined below:
i) the landscaping of parkways shall be completed as the
individual lots are developed,
Staff Comment: No objections.
2) all applicable fees shall be paid by the lot owners as
the individual lots are developed,
Staff Comment: The main fees in question are the water and sewer
availability fees. Since these fees are calculated on
the square footage of a building, and yet we do not
know the pad sizes at this time; therefore, waiver is
in order.
3) although Freeport Parkway is a secondary image-zone,
no trees will be permitted along the west right-of-way
because of the existing overhead electrical
transmission line,
Staff Comment: Although this is a standard requirement by T.U.
Electric, staff has had discussions with T.U. Electric
representative regarding the substitution of trees
underneath the transmission lines. Staff believes
that because this area is along a secondary
image-zone, small shrubs of limited height could be
planted along this area which would add the appeal of
attractive greenery versus no landscaping at all.
4) temporary drainage to be carried by grass lined
channel without concrete invert or brick facing on
headwalls, channel to be enclosed pipe system as
individual lots are developed,
Staff Comment: Due to unforeseen problems with temporary drainage
channels, staff recommends that the applicant submit a
hold-harmless and indemnity agreement which releases
the City of Coppell from any liability and indemnities
from any problems resulting from damages in any way
attributable to the channel. Additionally, the
applicant must submit a separate certification, which
indicates that the applicant has received permission
to drain on to the adjoining property, further
releasing the City from any liability.
5) no sidewalks shall be required for this development.
Staff Comment: Staff is not supportive of a complete waiver of the
deletion of sidewalks; however, we recommend that the
sidewalks be constructed when:
1) the majority of the property owners
association wants them , or
2) the Director of Public Works deems needed.
ALTERNATIVES: 1) Approve the final plat and deviations from the
Subdivision Ordinance as requested by the applicant.
2) Deny the final plat.
ATTACHI~ENTS: I) Final plat.
GWBPSTF
HEHOR~NDU~ .~
D~te: 3une 6~ 1990 ~-'
To: Ta~-yon Bowman - City of Coppell /.~ ,
From: John C. Karls~ul%er, P.E - Ginn, Inc.
Re: Gateway Business ~ark
As per our telephone discussion this morning, I will reiterate
th~ following point~:
1. The 12" water line proposed by the develope_c in Cotton Road
iS not vital tO the City's water system so there will be no
part ~-,~
~.~i..nn required by the City in its cost.
2. The !6" water line proposed in -Gateway Boulevard is planned
for in our latest update of the water system plan and
therefore the city will have to contribute by paying the
cost of the oversize beyond a 10" diameter water line in
accordance with the Subdivlsion ordinance as follows:
A. Appro×imate length 2,660 L.F.
B. City's contribution per Subdivision Ordinance -
$7.00/L. ~'.
C. City's apprc×tmate total contribution for 16" water
line in Gateway Boulevard:
2,660 L.F. x $7.00/L.F. = $18,620.00
The term.~ of the Subdi~i~ion Ordinance dictate that the City must
make the contribution or partial reimbursement as funds become
available.
Call me if you have any questions.