Loading...
Gateway BP(1.1)-CS 940818 ,-~'~/ //:--':-':-+-~"-:-~/=~>/~/'----~i'-~--L---,/·" · P.O. Box 478 ~'/ /~ ~! i~' I~----~IL~--:::::_~':.-I[-: .-:..-..-'/ /~/~~, Coppel,. Texas 75019 The City With A Beautiful Future 214-462-0022 August 18. 1994 Mr. John Giannopoulas Catellus Development Corporation One Lincoln Centre, Suite 910 Oakbrook Terrace, I1. 60181 Re: Gateway Business Park Dear Mr. Giannopoulas: This letter is written as a follow-up to our conversation on August 17, 1994, in which you requested information on what the fee would be if the City were to inspect the public improvements associated with the referenced project in accordance with standard City policies. Our typical inspection fee for public improvements is 2% of the project cost. I have reviewed the contract that was awarded on this project and Part III of the base bid covers all of the items that would be associated with the paving. The total dollar amount of Part III is $66,307.00. Therefore, inspection fee for the City to inspect those items would be $1,326.14. To get this project inspected by the City, you should instruct your Engineer to supply the City three copies of Sheets P-1 and P-2 along with a cover sheet and the necessa~ fees, so that I can assign an inspector to the project. If you should have any qu. estions please feel free to contact me at your convenience. Sincerely, Ke~. h M. Griffin, P.E. - ~ ~'-,~ Assistant City Manager/City Engineer LLI tile;kgriffinigianplas. Itt -: GATEWAY BUSINESS PARK - PHASE IIC PAVING - BASE BID UNII PRICE SCIIEDULE PART Ill P-I 101 S.Y. 3000 psi Compressive Strength Reinforced $ 50.00 S 5,050.00 Concrete Pavement (to Match Existing Pavement Depth), Complete in Place. . dollars and cents per square yard. P-2 101 S.Y. 8" - Cement Stabilized Sand or CTB S 28.00 $ 2,828.00 Subgrade, Complete in Place. dollars and ' cents per square yard. . P-3 28 L.F. 6-Inch Integral Concrete Curb, Complete in $ 5.00 ] 5 140.00 Place. dollars and cents per linear foot. Radius Solid Concrete Median Nose S 500.00 $ 500.00 P--4 1 Each 2' 6" to Match Existing Curb Height. Complete in Place. dollars anti cents per each. P-5 15,1 S.Y. Sawcut, Remove, and Offsite Dispose S 15.20 [ S 2,340.80 Existing Concrete Pavement from Areas Indicated on the Drawings. Complete in place. dollars and cents per square yard. P4 938 S.F. lrcstall Concrete Median Pavers (4 locations) S 6.8 0 .$ 6,3 7 8.4 0 with concrete base per City of Coppell standards. Complete in Place. dollars and cents per sqnare foot. P-7 1.152 S.F. Remove Brick Pavers and Concrete Base. $ 2 . 25 S 2 , 592 . 00 Backfill with Topsoil, Complete in Place. dollars and cents per square foot. Signed ~..~-.,~. ~~' SECTION 00140 - BID FORM I"AGE 9 P-8 1,208 S.F. Remove, Rehabilitate, and Replace Existing $ 4.00 $ 4,8 32.00 Concrete Median Pavers with Filter Fabric. Complete in Place. dollars and cents per square foot. P-9 264 S.F. Remove and Replace Existing Concrete S 3.0 0 $ 7 ca 2.00 Crosswalk Pavers, Complete in Place. dollars and cents per square foot. P-10 1.720 S.F. Sand Existing Concrete Crosswalk Pavers, $ .60 S 1,03 2.00 Complete in Place. dollars and cents per square foot. P-I 1 4 F~qch Reset Conduit Pull Boxes. Complete in $ 65.00 S 260.00 Place. dollars and cents per each. P-12 8 Each Install New Storm Sewer Covers, Complete $ 400.00 $ 3,200.00 in Place. dollars and cents per each. P-13 64 Each Cutoff Below Grade, Recap, and Mark $ 1 5.00 S 960.00 Existing Conduit Stubouts (All Sizes). Complete in Place. dollars and cents per each. P-14 120 L.F. Grind Existing Concrete Gutter, Complete in S 1 2.00 $ 1 , 440.00 Place. dollars and cents per linear foot. P-I 5 1.370 L.F. Install 2" Schedule 40 PVC Conduit, $ 3.9 0 S 5,34 3.0 0 Including Embedment, Complete in Place. dollars and cents per linear foot. P-16 4,200 L.F. Install 6" Schedule 40 PVC Conduit, $ 5.2 5 S 2 2,0 50.00 Including Embedment, Complete in Place. dollars and cents per linear foot. TOTAL PAVING BASE BID COST (Items P-I through P-16) $ 59,738.20 SECTION 00140 - BID FORM PAGE P-17 966 S.F. Remove concrete paving in median and S 6.80 $ 6,568.80 install unit pavers with concrete base per City of Coppell standards, Complete in Place. dollars and cents per square foot. 'IOTAL PAVING BASE BID COST (Items P-I through P-17) $ 66,307. O0 SECTION 00140 - BID FORM PAGE 10A