Loading...
Gateway BP(1.1)-CS 910426 Coppell, Texas 75019 (~/~ The City With A Beautiful Future 214-462-0022 April 26, 1991 Mr. Pat Acker, P.E. Albert H. Halff Associates 8616 Northwest Plaza Drive Dallas, TX 75225 ~: Gateway Business Park Final Acceptmce Dear Mr. Acker: A final inspection of the above referenced project has been conformed ~ representatives of tM City of Coppell. Paving and utilities have been verified and are in complimce with the City of Coppell st~dard remitments. As of this date, ~rmits can ~ issued to start construction. The one-year maintenmce bonds md as-built drawings have ~en received from both contractors. Maturity on the bonds will be one year from the date of this letter (~ril 26, 1991). Construction Inspector CnD/bd cc: M. S~hre Dmes~d, Acting City Engineer Howard Pafford, Water Su~rintendent Rey ~nzales, Street Su~rintend~t Rick Wielmd, Parks md Recreation M~ager Taryon P. Boom, Planning md Zoning Coordinator Gary L. Sieb, Director of Planning md Com~ity Services Dale Jackson, Building Official Bill Jones, L. H. Lacy Co. Bub Murray, Murray Construction Co.