Gateway BP(1.1)-CS 910125 COPPELL PUBLIC WORKS
MEMORANDUM
January 25, 1991
TO: Larry Davis, Construction Inspector /~
FROM: Rey Gonzales, Streets Superintendent~j
Per Birdsall, Sign/Signal Technicia~
RE: Gateway Business Park - Punch List/Inspection
With the exception of the yellow reflective 4" buttons on westbound
Gateway utilized for the transition from new paving to old and the
grading in the channel located between Cotton and Gateway, the
Street Division has no further comment.
For final acceptance in accordance with the Texas Manual on Uniform
Traffic Control Devices, the yellow buttons must be replaced with
white buttons. The channel understandably cannot be regraded until
conditions (weather) permit and a letter stating that the channel
will be regraded and associated sedimentation removed from storm
sewer pipe as soon as practicable must be received by Public Works
to clear this item for final acceptance at this time.
RG/PB/sm