Loading...
WA9302-CS 961127 · SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONVqAY, P.E. JOHN W. BIRKItOFF, P.E. JoE R. cAar~R, P.E. November 27, 1996 GARY C. H~NDRICKS, P.E. I. C. FINKI/iA, P.E. Mr. Larry Davis Construction Inspector City of Coppell P.O. Box 478 Coppell, Texas 75019-4409 Re: Village Parkway Ground Storage Reservoir No. 2 Dear Mr. Davis: We are enclosing a copy of the chemical test report prepared by Shetwin Williams and B & R Pipe Fabrication, Inc. for the inflow pipe on the interior of the tank sent to our office by Natgun. We offer no objections to the test report results. As you directed, we have informed Natgun that the tank shall be loaded immediately after the inflow pipe's coating system has been restored in all areas that were disturbed during the testing process. We are available to discuss this further at your convenience. Sincerely, Matt Hickey, E.I.T.~ Enclosure [~001 11/27/36 15:17 '~617 245 3279 I~ATGU.~ CORP. _ FAX } Date 11/27/96 ~ Number of pages including cover sheet 3 TO: Gary Hendricks FROM: Anthony DIGiovanni, P.E. Shimek, Jacobs, & Finklea Natgun Corporation 8333 Douglas Avenue 11 Teal Road Suite 820 Wakefield, MA 01880 Dallas, TX 75225 Phone 214-361-7900 Phone 617-224-5135 Fax Phone 214-36%0204 Fax Phone 617-224-5153 IRE: Epoxy Coating Coppell, TX REMIIRK$: [] Urgent [] For your review [::] Reply ASAP [] Please Comment Gary: Based on Natgun's conversations with and letters from Sherwin Williams and B & R Pipe Fabrication, Inc., we feel confident that the epoxy coating will protect the pipes on the interior of this tank. If additional documentation is required. please give me a call at 617-224-5135. 11/27/36 15:17 8617 245 3279 NATGUN CORP. [~002 11-27-1996 2: 20PM B AND R PIPE FAB, 817 ~ '~ p, ~ B & R PIPE FABRICATION, INC, BOX 1603 · ROANOKE TEXAS 76262 ,'} (817) ~30-3281 November 27, 1996 Natgun Corp. 11 Teal Ro~d Wakefield, MA 01880 ATTN: Mr. Anthony DiGiovanni RE : City of Coppell 3torage Tank Dear Anthony, After a personal field inspection and discussing the coating with $herwin. Williams Company. B & R Pipe Fabrication, Inc. feels the coating was applied in accordance w~.th the manufacturers recommendations. After inspecting the coating we ~re in agreement with $herwln Willjams' letter, that the rust is on the surface of the pipe. coating. The coating i$ protecting the pipe in accordance with the contract requirements. If we can be of further assistance please call at 817/430'-3281. W. R. Nolen General Manager CO: Bill Page 11/27/36 15:18 9617 245 3279 NATGUN CORP, ~003 Nov-27-96 11:06 B , Fabrication ~ .dL.~. 792 923~ P.O1 SHERWIN WILLIAMS South Western Division - Regional lab To: T.l.,muih~n cc J. Hilton. J'. fieTdridk g. COMPANY CONFIDENTIAL '.~L~ g4iS'l~D