ST9802-CN000314 CITY OF COPPELL
CHANGE OR EXTRA WORK ORDER
PROJECT: DIVIDEND DRIVE PROJECT ST98-02
CONTRACTOR: McMahon Contracting, Inc.
OWNER: CITY OF COPPELL
CHANGE ORDER: #2 DATE: 2/15/00
Item Quantity Unit Description Unit Price Total Price
#
1 13,550 SF Installation ofbrickpavers in two circle 3.04 41,192.00
areas on Dividend Drive
Total Addition 41,192.00
TOTAL CHANGE ORDER #1 $41,192.00
Previous Contract Amount $555,231.15
Total Change Order #2' $41,192.00
Revised Contract Amount $596,423.15
Net Increase in contract time of completion 50 Calendar Days
Revised contract time of completion 170 Calendar Days
The contractor hereby accepts this contract adjustment as a f'mal and complete adjustment in
full accord and satisfaction of all past and future liability originating under any clause in the
Contract by reason for this revision to the Contract.
Recommenlled by City Engineer Date Date
SEE ~IT '
EXHIBIT "A" MEDIAN ,~.~,~,~.~Es~,A~.ANB~
~ LANDSCAPE ESM'T
0 25 50 75 100 150 200 300
SCALE IN FEET
//
/ 9,00
,~ ~ -
LANDSCAPE ESM'T AND
SET BACK
'.L CONCRETE ~;AVERS ~ND SAND BEDDING
COURSE THIS CONTRACT
CONCRETE BASE TO BE DONE BY OTHERS
33.52' ALONG R.O.W.
CENTER OF CIRCLES,'
N=4982.29
E=4942. 17
D/V/_DEND ,.
34.85' ALONG
INSTALL:
CONC. PA VER RAMP (3' WIDE) &
PAVERS TO BE RIVER RED, THE
, , , . CITY OF COPPELL STANDARD.
SCALE tN FEET
EXHIBIT "B"
· ,~ cc I.- ~ 25.00' END "" ""
PVM'T ~ -,
TC=536.02
\ -\,
...... ,~,
DIFIDEND
ll+O0
I
CENTER OF CIRCLES:
N=4445,26
E=5134.66
AT PAVEMENT CONNECTION, :t 7.25'
INSTALL DOWELED EXPANSION
JOINT PER CITY OF COPPELL 28.5'
STANDARDS
"' ~ m R 50'
INSTALL,
CONC. PAVER RAMP (3'WIDE]&
WALK (4' WIDE] ON EACH SIDE 25.0'
OF EVERY DRIVE. CONCRETE
PAVERS TO BE RIVER RED, THE R.O.W.
CITY OF COPPELL STANDARD.
MONUMENT SIGN & CURBING SIGN & CURBING
THIS CONTRACT. SEE THIS CONTRACT. SEE
ARCHITECTURAL )RAWINGS. ARCHITECTURAL DRAWINGS.
INSTALL CONCRETE PAVERS AND SAND BEDDING
COURSE THIS CONTRACT
CONCRETE BASE TO BE DONE BY OTHERS
SCALE IN FEET
EXHIBIT "C '
...~. . MONUMEN
.., '\
~ A= 90'12'.33' ',
""' ~ R= 40'
· '?..:;?" \ T= 40.14'
:;: \ ~ L = 62.97' ] o ~o 2o 3o 4o 6o
\ ~ LT FACE OF GURB)
(69.75' '~' 42
Z~= 7'34'54'
;""' \ --i R= 479.50'
,.': L=
L T TO FACE OF CURB)
......
: ~ -~ F,..-?.~676.54
47~g 0
'35'4 ' "~--.
o. oo,~ ,, '---,.
T=
2.6' ', '~--.
L=5.4' '~ "'-.,
MATCH EXISTING Z)~ '?VIE) ~
TOP OF PAVEMENT ~
/ "'29..00'/? % FACE OF CLIR'B~
REMOVE " N 0
ASPHAL SHOULDERS;: / '~- =52~'zt ~
· / ~ ...~E=4657.00~-.,.
/ A= 7'36'49''~'''' ~ ~
R= 420.50'
~'~:, T= 27.97'
L= 55.87' ~ "\,,
INSTAI PAVER5 PER CITY OF COPPELL"~
z~= 90'08'56' STANDARDS. COLOR AND PATTERN TO BE
:.:. R= 40' SELECTED BY OWNER AND APPROVED BY
2~. T= 40.10' CITY OF COPPELL
'~'.' ! L= 62.93'
"' ~ PC CL STA.I+O0
;'.~'
~,~i ~ (69.52' RT)
· ~ N=5213.58
, ~ E=4555.89 PRC CL 5TA. I+40.10
· ,~ ' (29.00' RT TO FACE OF CURB)
· = !' I N=5244.71
,:' ! E=4603.21
'- ' E XHIB I T "D"
HALFF ASSOCIATE.'~'~NC. ';
Engineers · Scientists · Su,,,yors
8616 Northwest Plaza Drive LETTER OF TRANSMITTAL
Dallas, Texas 75225
DATE: 3-31-00 [ AVO: 17014
214-739-0094 · FAX 214-739-0095
ATTENTION: Kent Collins
TO: CITY OF COPPELL, ENGINEERING DEPT. RE: DIVIDEND DR.
COPPELL, TX (PID PROJECT)
255 PARKWAY BLVD.
COPPELL, TX 75019
WE ARE SENDING YOU [] Attached [] Under Separate cover via the following items:
[] Shop Drawings [] Prints [] Plans [] Tracings [] Specifications
[] Copy of letter [] Change order [] Other
COPIES DATE NO. DESCRIPTION
2 copies of signed change order #2
THESE ARE TRANSMITTED as checked below:
[] For approval [] Approved as submitted [] Resubmit copies for approval
[] For your use [] Approved as noted [] Submit copies for distribution
[] As requested [] Returned for corrections [] Return corrected prints
[] For review and comment [] Other
[] FOR BIDS DUE
[] PRINTS RETURNED AFTER LOAN TO US
COMMENTS: If you have any questions, please give me a call. Thanks.
COPY TO:
SIGNED: TODD JACKSON
If enclosures are not as noted, kindly notify us at once.