Loading...
Gateway BP(1.3)-CS 99070109/01/99 12:02 CITY OF COPPELL a CITY OF COPPELL N0.~00 ~0~ C~P~EL~ UTIL3:T~ES DI'V'/SIGM DAT~ '. Ti~: TO: FR~: RE: July 1, 1999 2=00 P.M. Larry Davis, Construction Inspector Danny Hightower, Utilities Division Walk-thru Gateway Business Park, Lot 2 Blk I Listed below are Utility Division comments relative to walk thru. 1. Test (3) 2" irrigation and (1) 2" domestic double check paper work· Test 2 vaults - paperwork. Oil all fire hydrants. Clean all irrigation boxes below lower fittings and no water in cans. Loca~e fire hydrant valves north side of building. Valve extension on valves lower than 4'. All double check 2" need ball valve plugs.