Loading...
Gateway BP(1.3)-CS 990618MEMORANDUM From: RE: Mike Martin, Asst. City Engineer Doug Stevens, Engineering Technician Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official WALK-THRU for Gateway Business Park Lot 2 and Common Area 1, Block 1 Date: June 18, 1999 A final walk-thru for utilities and paving on the referenced project has been scheduled for Thursday, Sune 24, 1999 at 8:30 a.m. If I can be of further assistance please let me know. Lee Stone, Commercial Inspector John Skinner, Patco Utilities (fax: 972-641-8233) Robert McCaun, Catellus Dev. (fax: 972-719-6149) ¢,v